You don't need the product names or old records. No fee unless we recover compensation for your family.
A one-page letter of July 29, 1935, from E. H. Jeffords, general manager of Raybestos-Manhattan's General Asbestos & Rubber Division at North Charleston, South Carolina, to Sumner Simpson, president of Raybestos-Manhattan, on the plant's new dust collecting system. Jeffords sent copies of Edward A. Barrier's July 25 letter and his reply, and reported that burlap for the baffles had been ordered from the Armstrong Cork Co. and that rain had delayed piping the collectors to the dust house. The baffles would be installed on Saturdays and Sundays, "when the Mill is shut down," and the roof tunnel would wait until the company was sure "the burlap baffles will work successfully."
- Author
- E. H. Jeffords
- Sent to
- Sumner Simpson
- Published by
- Raybestos-Manhattan
- Series
- The Sumner Simpson Papers
- Date
- July 29, 1935
- Number
- Simpson no. 02501
- Library no.
- ACL Doc 13288 · asbestosclaims.law/library/13288
- Rights
- Republished under fair use for research and historical study.
Read or download
Read online Download the PDF Letter, July 29, 1935 · 1 pages · 89 KB
What it shows
Jeffords kept Raybestos-Manhattan's president informed of each step of the North Charleston dust collection work. He presented the tunnel partly as a question of cost: the old pipe lines were wearing out and would have to be replaced if the tunnel was not built.
In Johns-Manville's index
Johns-Manville's attorneys indexed the Sumner Simpson Papers. Their index describes this document as follows:
Progress report on construction of new dust collecting system. Have been delayed on account of rain but have most pipelines completed and are ready to install burlap baffles. Work on the tunnel has been postponed until it is known if the burlap baffles will work. Encloses correspondence to and from E. Barrier (not attached).
Related documents
- Edward A. Barrier of Arkwright Mutual to E. H. Jeffords on the North Charleston Dust Tunnel Plans (1935)
- E. H. Jeffords to Sumner Simpson on the Dust Settling Chamber and Arkwright Correspondence (1935)
About this copy
This is document 02501 of the Sumner Simpson Papers, as numbered in the collection's index.
Cited on this site
- Asbestos Timeline
- Carl G. Richmond of Arkwright Mutual to E. H. Jeffords with the Fire Test Report on the Asbestos-Cotton Dust (1935)
- E. H. Jeffords to Carl G. Richmond of Arkwright Mutual Sending the Dust Tunnel Blueprint (1935)
- E. H. Jeffords to Sumner Simpson on the Dust Settling Chamber and Arkwright Correspondence (1935)
- Edward A. Barrier of Arkwright Mutual to E. H. Jeffords on the North Charleston Dust Tunnel Plans (1935)
- The Sumner Simpson Papers
Cite this document
“E. H. Jeffords to Sumner Simpson on Progress of the North Charleston Dust Collecting System.” July 29, 1935. The Sumner Simpson Papers, Simpson no. 02501. Raybestos-Manhattan. AsbestosClaims.Law Library, ACL Doc 13288. https://asbestosclaims.law/library/13288.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.