Assistant Plant Manager at Union Carbide's South Charleston, West Virginia plant in 1987; received or was copied on memos on asbestos labelling, removal procedures and enclosures, glove-bag use, disposal bids and SHARE inspection results, and a transite siding removal project scope.
S. W. Drake appears in 12 Union Carbide documents (1987). The documents describe S. W. Drake as Assistant Plant Manager.
You don't need the product names or old records. No fee unless we recover compensation for your family.
Titles in the documents
How documents describe S. W. Drake, each as the documents state it, with how many say so and the years they span. We record what the documents say and don't choose between them.
- Assistant Plant Manager, 1987, in 1 document
In the Union Carbide documents
S. W. Drake is named in 12 Union Carbide documents dated 1987 (6 as recipient, 6 copied), from asbestos lawsuits over Union Carbide's Calidria asbestos. 11 of them are published in our collection.
- C. R. Rotthoff to W. J. Vincent on South Charleston Provisions for Asbestos Material Removal and Disposal (1987) UC-3166 (copied)
- C. R. Rotthoff to W. J. Vincent Transmitting Comments on South Charleston Provisions for Asbestos Material Removal and Disposal (1987) UC-4003 (copied)
- W. J. Vincent to All Department Heads on Labelling of Asbestos Materials, with Standard Practice SH-256 on Removal and Handling of Asbestos-Containing Insulation (1987) UC-2085 (copied)
- J. K. Corrie to Maintenance Staff Transmitting Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987) UC-2295 (recipient)
- J. K. Corrie to J. R. Dement and Others Circulating Draft Maintenance Safety Procedure XVIII, Asbestos Handling, South Charleston Plant (1987) UC-3132 (recipient)
- W. J. Vincent to J. K. Corrie on Glove Bag Usage During Removal of Damaged Asbestos Gasket (1987) UC-2286 (copied)
- M. J. Shoger to J. K. Corrie and Others on Asbestos Enclosures and HWP Requirements Meeting (1987) UC-2136 (recipient)
- Memo to J. R. Soice on Alternate Asbestos Disposal Site Bids, South Charleston Plant (1987) UC-3861 (copied)
- S. B. Kovach to D. R. Stokely Transmitting SHARE Inspection Results, South Charleston Plant (1987) UC-3627 (copied)
- T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987) UC-3161 (recipient)
- S. B. Kovach to P. R. Desai and Others Transmitting SHARE Inspection Results, South Charleston Plant (1987) UC-3633 (recipient)
Names in the documents
The spellings documents use for S. W. Drake, OCR misreadings included, so a search for any of them finds this page: S. W. Drake (cc, copy of letter only) · S. W. Drake (cc).
Where this comes from
This page brings together every document in our library that names S. W. Drake, across collections. Titles and affiliations are taken from the documents themselves.
Cite this page
“S. W. Drake.” AsbestosClaims.Law Library. https://asbestosclaims.law/library/people/s-w-drake.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.