No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Asbestos Pipe Insulation Removal at the Tarrytown IBM Building and Westchester Airport Hangar D: Contractor Quotes, Notices and Memos (1983-1984)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

Forty-page file on removing or sealing asbestos pipe, tank and wall insulation at the IBM Eastview building in Tarrytown and at Union Carbide's leased Hangar "D" at Westchester County Airport. It holds contractor proposals (United Painting, Duall Inc., N. Fabian), air-sample results, EPA/OSHA/state notices, IBM correspondence, a December 1983 Union Carbide industrial hygiene memo, and the Corporate Occupational Health Manual's contractor on-site policy.

Author
A.M.Stein (President, United Painting Co., Inc.); B.F. O'Reilly (Union Carbide Building Services (Manager, Building Services, on the 1983 letter))
Published by
Union Carbide Corporation, Tarrytown, N.Y. (Purchasing, Engineering and Utilities Services, Health & Safety), with outside contractor and IBM papers
Series
Union Carbide documents, UC-450
Number
Bates A03440 to A03441
Library no.
ACL Doc 15697 · asbestosclaims.law/library/15697
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-450 · 40 pages · 1.2 MB

What the document holds

  • Page 1: United Painting Co. proposal to Union Carbide, Tarrytown, to remove about 560 sq. ft. of pipe insulation at the IBM building, $4,875 (Feb. 1, 1984)
  • Page 2: B.F. O'Reilly to Gerard W. Kottman on removing asbestos on two hot water tanks and pipes at the airport hangar (Feb. 9, 1984)
  • Page 3: United Painting proposal to E. R. Majka for removal and replacement of pipe and tank insulation, $9,754 (Mar. 20, 1984)
  • Page 4: R. L. Bujalski memo to E. R. Majka on his April 27-28 visits to Hangar D during asbestos removal (May 8, 1984)
  • Page 5: United Painting (A. M. Stein) to Majka transmitting air sample test results for Hangar D (undated; received stamp July 1984)
  • Pages 6-7: Testwell Craig Testing Laboratories report on airborne asbestos fiber counts for United Painting, Hangar D (June 25, 1984)
  • Page 8: United Painting handwritten air monitoring log sheet
  • Pages 9-10: B.F. O'Reilly to Gerard W. Kottman with cost options for asbestos removal and painting of Hangar D (Sept. 8, 1983)
  • Page 11: IBM (Frank G. Evon) to Frank Gallo forwarding test results on piping insulation at Eastview (Jan. 16, 1984)
  • Page 12: Clayton Environmental Consultants results of analyses for IBM: amosite and chrysotile in pipe insulation sample
  • Pages 13-16: Duall Inc. quotation to Robert Ricciardi for asbestos removal at IBM Research, Eastview, $8,700 (Jan. 30, 1984)
  • Page 17: United Painting (A. M. Stein) to E. R. Majka transmitting notices of intention to remove asbestos (Apr. 4, 1984)
  • Pages 18-27: United Painting notices of intention to remove asbestos at Hangar D, sent to Union Carbide, EPA Region II, OSHA, EPA NESHAP coordinator and NYS DEC (Apr. 4, 1984)
  • Pages 28-31: Duall Inc. (George Loper) asbestos abatement quotations #1-#3 for Hangar D to E. Majka (Aug. 29, 1983)
  • Pages 32-33: Duall Inc. (Anthony Natale) cover letter to Majka on its removal methods and testing (Aug. 29, 1983)
  • Page 34: Francis M. Gallo to J. Clark, IBM, on planned work on asbestos pipe insulation, to be awarded to N. Fabian Company (Feb. 15, 1984)
  • Pages 35-36: IBM letter to Frank Gallo setting guidelines for insulation removal and sealing at Eastview (Feb. 12, 1984)
  • Pages 37-38: L. W. Youngblood memo to A. J. Wiltjer on the Dec. 6, 1983 hangar inspection and recommended controls for asbestos materials (Dec. 16, 1983)
  • Pages 39-40: Union Carbide Corporate Occupational Health Manual policy, Contractor On-Site (Oct. 2, 1980)

People and organizations

From A.M.Stein (President, United Painting Co., Inc.); B.F. O'Reilly (Union Carbide Building Services (Manager, Building Services, on the 1983 letter)) to Mr. Gerard W. Kottman (Westchester County Airport, White Plains, N.Y.).

Pages on our site about what this document covers: Asbestos insulation: pipe covering, block, and insulating cement · EPA · Industrial Hygiene · NIOSH · New York Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage · OSHA.

About this copy

This is document UC-450 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 40 pages. Production numbers A03440 to A03441.

Cite this document

A.M.Stein (President, United Painting Co., Inc.), B.F. O'Reilly (Union Carbide Building Services (Manager, Building Services, on the 1983 letter)). “Asbestos Pipe Insulation Removal at the Tarrytown IBM Building and Westchester Airport Hangar D: Contractor Quotes, Notices and Memos (1983-1984).” Union Carbide documents, UC-450, Bates A03440 to A03441. Union Carbide Corporation, Tarrytown, N.Y. (Purchasing, Engineering and Utilities Services, Health & Safety), with outside contractor and IBM papers. AsbestosClaims.Law Library, ACL Doc 15697. https://asbestosclaims.law/library/15697.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.