You don't need the product names or old records. No fee unless we recover compensation for your family.
Cover memo from the Texas City construction manager circulating a rough draft of Site Procedure 15-D for removing asbestos insulation, to be used on an interim basis for the Ethyleneamines shutdown starting June 20, 1977. The attached draft makes OSHA 29 CFR 1910.93a the governing reference and divides monitoring, protective clothing, medical examination and record-keeping duties between Union Carbide and its contractors. Pages 5-7 are a Federal Register reprint of the OSHA asbestos standard.
- Author
- J. L. Rosenberger (Construction Manager)
- Published by
- Union Carbide Corporation, Chemicals and Plastics, Texas City
- Series
- Union Carbide documents, UC-1137
- Date
- June 6, 1977
- Number
- Bates UCTC 17288 to UCTC 17291
- Library no.
- ACL Doc 16313 · asbestosclaims.law/library/16313
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-1137 · 7 pages · 619 KB
What the document holds
- Page 1: Cover memo from J. L. Rosenberger, June 6, 1977, transmitting draft Site Procedure 15-D
- Pages 2-4: Rough draft Site Procedure 15-D, Removal of Asbestos Insulation, Union Carbide Construction, Texas City
- Pages 5-7: Federal Register reprint (Oct. 18, 1972) of OSHA 29 CFR 1910.93a asbestos standard and start of 1910.94 ventilation
People and organizations
From J. L. Rosenberger (Construction Manager) to Mr. L. E. Calvert; Mr. C. W. Carman; Mr. W. P. Haskins; Mr. J. R. Latham; Mr. Dave Leach (Johns-Manville); Mr. C. D. Matthews (Johns-Manville); Mr. J. L. Mitchell (Courtney & Co.); Mr. G. M. Parrish (United Engineers); Mr. W. A. Shirey (Crescent Electric); Mr. P. F. Stepchinski (Crescent Electric); Mr. W. D. Weber (copy recipient).
- J. L. Rosenberger (author)
- Larry E. Calvert (recipient)
- C. W. Carman, Jr. (recipient)
- W. P. Haskins (recipient)
- J. L. Mitchell (recipient)
- G. M. Parrish (recipient)
- W. D. Weber (copied)
- Union Carbide Corporation (its organization)
- American National Standards Institute (named)
- Johns-Manville (named)
- OSHA (named)
Related pages
Pages on our site about what this document covers: Johns-Manville · OSHA · OSHA Asbestos Standard · Texas Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-1137 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 7 pages. Production numbers UCTC 17288 to UCTC 17291.
Cite this document
J. L. Rosenberger (Construction Manager). “J. L. Rosenberger to L. E. Calvert and Others Transmitting Draft Site Procedure 15-D on Removal of Asbestos Insulation at Texas City.” June 6, 1977. Union Carbide documents, UC-1137, Bates UCTC 17288 to UCTC 17291. Union Carbide Corporation, Chemicals and Plastics, Texas City. AsbestosClaims.Law Library, ACL Doc 16313. https://asbestosclaims.law/library/16313.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.