You don't need the product names or old records. No fee unless we recover compensation for your family.
Engineering request and job authorization (NP-1020, request 514-0471) for a $182,000 project to remove asbestos insulation from idle equipment and lines at the South Charleston Plant. It gives occupational health as the justification, cites the OSHA two fibers/cc limit, and describes the safety guidelines, cost estimate and project plan. A field entry justification work request is attached.
- Author
- JF Dodd (Sponsor, Maintenance Dept., Specialty Chemicals); P. G. West / L. Beckett (Estimators (Maintenance))
- Published by
- Union Carbide Corporation, Specialty Chemicals Division, Engineering Department
- Series
- Union Carbide documents, UC-2142
- Date
- 1985
- Number
- Bates UCC 006643 to UCC 006647
- Library no.
- ACL Doc 17160 · asbestosclaims.law/library/17160
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-2142 · 5 pages · 230 KB
What the document holds
- Page 1: Request and job authorization form NP-1020 with budget, routing and approval signatures
- Page 2: Objective, justification, alternatives, occupational health and environmental considerations
- Page 3: Basis of estimate, project plan and project team
- Page 4: Estimate summary and expenditure forecast
- Page 5: Field entry justification / maintenance work request NP 2178 to remove asbestos insulation
People and organizations
From JF Dodd (Sponsor, Maintenance Dept., Specialty Chemicals); P. G. West / L. Beckett (Estimators (Maintenance)) to R. J. Anderson and others on the approved work order distribution list.
- Joseph F. Dodd (author)
- Specialty Chemicals Division (its organization)
- Union Carbide Corporation (its organization)
- Engineering Department (named)
- EPA (named)
- Maintenance Department (named)
- Middle Island Department (named)
- OSHA (named)
- Polyols Department (named)
- Solutions Vinyls Department (named)
- Specialty Catalyst Department (named)
- Upper Island Department (named)
Related pages
Pages on our site about what this document covers: EPA · OSHA · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-2142 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 5 pages. Production numbers UCC 006643 to UCC 006647.
Cite this document
JF Dodd (Sponsor, Maintenance Dept., Specialty Chemicals), P. G. West / L. Beckett (Estimators (Maintenance)). “Union Carbide Specialty Chemicals Division Engineering Request NP-1020 for Asbestos Insulation Control, Phase II, South Charleston Plant.” 1985. Union Carbide documents, UC-2142, Bates UCC 006643 to UCC 006647. Union Carbide Corporation, Specialty Chemicals Division, Engineering Department. AsbestosClaims.Law Library, ACL Doc 17160. https://asbestosclaims.law/library/17160.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.