No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Keith to B. Myer on Progress of the Insulation Upgrade (Glove-Bag Removal of Asbestos Pipe Insulation) at Sistersville (1988)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

A handwritten progress note on an "Insulation upgrade" program that began 1/21/88 in the basement of building #1. It reports that insulation was removed by the glove bag method and gives footage identified and striped to date, and the remaining work and schedule. The second page is a contractor log sheet for Union Carbide, Sistersville, W. Va., January 1988, listing pipe sizes and lengths, man-hours and identified asbestos footage by date in the lab basement, with totals of 738.5 feet and 1632.

Author
Keith (first name only, from signature)
Published by
Union Carbide Corporation (Sistersville, W. Va. facility)
Series
Union Carbide documents, UC-2185
Date
February 1, 1988
Number
Bates UCC 007060 to UCC 007061
Library no.
ACL Doc 17198 · asbestosclaims.law/library/17198
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2185 · 2 pages · 86 KB

What the document holds

  • Page 1: Handwritten note, To B. Myer, Subject: Insulation upgrade, reporting progress of the glove-bag insulation removal program
  • Page 2: Contractor log sheet, Union Carbide, Sistersville W.V., Job No. 0014, January 1988, pipe footage and man-hours by date

People and organizations

From Keith (first name only, from signature) to B. Myer (handwriting read from image).

Pages on our site about what this document covers: Asbestos insulation: pipe covering, block, and insulating cement · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-2185 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 2 pages. Production numbers UCC 007060 to UCC 007061.

Cite this document

Keith (first name only, from signature). “Keith to B. Myer on Progress of the Insulation Upgrade (Glove-Bag Removal of Asbestos Pipe Insulation) at Sistersville.” February 1, 1988. Union Carbide documents, UC-2185, Bates UCC 007060 to UCC 007061. Union Carbide Corporation (Sistersville, W. Va. facility). AsbestosClaims.Law Library, ACL Doc 17198. https://asbestosclaims.law/library/17198.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.