No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Union Carbide South Charleston Plant Asbestos Estimate Forms for Sealing, Stripping and Reinsulating Insulation (undated)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

A set of Union Carbide 'Asbestos Estimate' forms for the South Charleston Plant. Each form names a plant area in handwriting and estimates the work to seal, cover, strip, or strip and reinsulate asbestos insulation there. The forms explain a priority rating and a color code for the work needed. Page 1 (Fire Tower, south side of upperbridge) shows handwritten actual manhours of 388. A later page describes pictured lines at a stairway at the northwest corner of building 195, color-coded red, with manhours listed.

Published by
Union Carbide Corporation, Silicones and Urethane Intermediates, South Charleston Plant (W. Va.)
Series
Union Carbide documents, UC-2290
Number
Bates UCC 002247 to UCC 002258
Library no.
ACL Doc 17282 · asbestosclaims.law/library/17282
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2290 · 12 pages · 400 KB

What the document holds

  • Page 1: Asbestos estimate form, department: Fire Tower South Side of Upperbridge; actual manhours handwritten as 388
  • Page 2: Asbestos estimate form, department: Loading Rack North of 209 Shed; manhours and cost blank
  • Page 3: Asbestos estimate form with handwritten department name and actual manhours (handwriting illegible in OCR)
  • Page 4: Asbestos estimate form with handwritten department and actual manhours (OCR reads roughly '200'; not verified)
  • Page 5: Asbestos estimate form with handwritten department; OCR suggests a garage, Bldg. #428 (uncertain)
  • Page 6: Asbestos estimate form with handwritten department (possibly a shop; illegible in OCR)
  • Page 7: Asbestos estimate form with handwritten department and insulator manhours estimate (illegible in OCR)
  • Page 8: Page with a handwritten notation (apparently 'WV-0191') and Bates number only; no legible typed text
  • Page 9: Asbestos estimate form with department, manhours and cost fields blank
  • Page 10: Picture description sheet: unused line and two lines at stairway, N/W corner of bldg. 195; priority 1, color coded red, manhours 24 and 32
  • Pages 11-12: Pages with Bates numbers only; OCR shows no legible text (likely photographs)

People and organizations

Pages on our site about what this document covers: West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-2290 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 12 pages. Production numbers UCC 002247 to UCC 002258.

Cite this document

“Union Carbide South Charleston Plant Asbestos Estimate Forms for Sealing, Stripping and Reinsulating Insulation (undated).” Union Carbide documents, UC-2290, Bates UCC 002247 to UCC 002258. Union Carbide Corporation, Silicones and Urethane Intermediates, South Charleston Plant (W. Va.). AsbestosClaims.Law Library, ACL Doc 17282. https://asbestosclaims.law/library/17282.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.