No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

I. L. Beckett to J. F. Dodd and Others on Project Scope for Safety/Health Insulation, No. 2 Powerhouse, Building 151 (1985)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

Memorandum setting out a project scope for removing, replacing or sealing deteriorated asbestos insulation in the No. 2 Powerhouse (Building 151) at South Charleston, West Virginia. It describes the capital and removal work, safety and environmental requirements, contractor performance, schedule, and approval signature lines. Copied to W. E. Ballard, R. G. Harmon, R. E. McEldowney, P. B. Smith and A. B. Williamson.

Author
I. L. Beckett (Project Manager)
Published by
Union Carbide Corporation, Silicones & Urethane Intermediates, Engineering, South Charleston, West Virginia
Series
Union Carbide documents, UC-2314
Date
April 17, 1985
Number
Bates UCC 003101 to UCC 003104
Library no.
ACL Doc 17304 · asbestosclaims.law/library/17304
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2314 · 4 pages · 129 KB

People and organizations

From I. L. Beckett (Project Manager) to J. F. Dodd (Engineering Manager); C. E. Fry (514 Health & Safety); P. D. Gossage (Maintenance Dept. Head); J. G. Roy (Energy Systems Rep.); T. G. Swanson (Energy Systems Dept. Head); P. G. West (Maintenance Dept. Rep.); J. L. Worstell (514 Environmental Protection).

Pages on our site about what this document covers: EPA · OSHA · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-2314 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 4 pages. Production numbers UCC 003101 to UCC 003104.

Cite this document

I. L. Beckett (Project Manager). “I. L. Beckett to J. F. Dodd and Others on Project Scope for Safety/Health Insulation, No. 2 Powerhouse, Building 151.” April 17, 1985. Union Carbide documents, UC-2314, Bates UCC 003101 to UCC 003104. Union Carbide Corporation, Silicones & Urethane Intermediates, Engineering, South Charleston, West Virginia. AsbestosClaims.Law Library, ACL Doc 17304. https://asbestosclaims.law/library/17304.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.