You don't need the product names or old records. No fee unless we recover compensation for your family.
Memo reporting a follow-up inspection of the transite (asbestos-cement) piping in the South Charleston plant wastewater collection system, covering joint deflection, repairs and general integrity. It recommends a contingency plan for replacement and attaches installation-guide excerpts and a 1978 underground piping newsletter (UGP-5). The memo is not about Calidria or Union Carbide's asbestos sales.
- Author
- H. G. Clem (Central Engineering, Engineering and Hydrocarbons Division)
- Published by
- Union Carbide Corporation, Engineering and Hydrocarbons Division, Central Engineering
- Series
- Union Carbide documents, UC-2413
- Date
- July 18, 1984
- Number
- Bates UCC 015708 to UCC 015714
- Library no.
- ACL Doc 17392 · asbestosclaims.law/library/17392
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-2413 · 7 pages · 304 KB
What the document holds
- Pages 1-3: Memo from H. G. Clem, July 18, 1984, on inspection of transite piping at South Charleston plant
- Pages 4-6: Attached excerpts from the Transite Ring-Tite Pressure Pipe Installation Guide (curve deflection table, pages 14-15; repairs to damaged pipe, pages 98-101)
- Page 7: UGP-5 Underground Piping Newsletter by L. A. Peggs, February 1978, revised November 1978
People and organizations
From H. G. Clem (Central Engineering, Engineering and Hydrocarbons Division) to J. A. Fey, 514; A. E. Wood, 514.
- H. G. Clem, Jr. (author)
- Engineering and Hydrocarbons Division (its organization)
- Union Carbide Corporation (its organization)
- Central Engineering (named)
- J-M A/C Pipe Corporation (named)
Related pages
Pages on our site about what this document covers: Calidria · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-2413 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 7 pages. Production numbers UCC 015708 to UCC 015714.
Cite this document
H. G. Clem (Central Engineering, Engineering and Hydrocarbons Division). “H. G. Clem to J. A. Fey and A. E. Wood on Inspection of Transite Piping in the South Charleston Plant Wastewater Collection System.” July 18, 1984. Union Carbide documents, UC-2413, Bates UCC 015708 to UCC 015714. Union Carbide Corporation, Engineering and Hydrocarbons Division, Central Engineering. AsbestosClaims.Law Library, ACL Doc 17392. https://asbestosclaims.law/library/17392.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.