You don't need the product names or old records. No fee unless we recover compensation for your family.
Internal Union Carbide correspondence reporting the results of a Task Group, requested by the Manufacturing Council, on continued use of asbestos-containing materials in Chemicals and Plastics (C&P) workplaces. It recommends that C&P phase out their purchase and installation, without a formal variance, after January 1, 1989. Attached are two pages (5 and 6 of 6) of a Central Engineering recommended practice, SH-256, on asbestos demolition, renovation, removal and disposal requirements.
- Author
- J. E. Sanders (Engineering, Manufacturing and Technology Services, Central Engineering, Technical Center, South Charleston, WV)
- Published by
- Union Carbide Corporation, Engineering, Manufacturing and Technology Services, Central Engineering
- Series
- Union Carbide documents, UC-2440
- Date
- October 14, 1986
- Number
- Bates UCC 015841 to UCC 015707
- Library no.
- ACL Doc 17419 · asbestosclaims.law/library/17419
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-2440 · 4 pages · 178 KB
What the document holds
- Pages 1-2: Internal correspondence from J. E. Sanders to B. G. Perry recommending a C&P phase-out of asbestos-containing materials in the workplace
- Pages 3-4: Pages 5-6 of 6 of Central Engineering Recommended Practice SH-256 on EPA notification, removal and disposal requirements for friable asbestos, with a warning-sign text and an audit provision
People and organizations
From J. E. Sanders (Engineering, Manufacturing and Technology Services, Central Engineering, Technical Center, South Charleston, WV) to B. G. Perry (addressee; the Manufacturing Council requested the Task Group through him); P. O. Franson (copy recipient); P. R. Kavasmaneck (Dr.; copy recipient); W. G. Lilly, Jr. (copy recipient); C. C. Neely (Corporate Fellow - Engineering Mechanics; headed the Task Group; copy recipient); S. W. Turicchi (copy recipient).
- J. E. Sanders (author)
- P. R. Kavasmaneck (recipient)
- C. C. Neely (recipient)
- B. G. Perry (recipient)
- P. D. Franson (copied)
- W. G. Lilly, Jr. (copied)
- S. W. Turicchi (copied)
- Engineering, Manufacturing, and Technology Services (Union Carbide) (its organization)
- Union Carbide Corporation (its organization)
- Central Engineering (named)
- EPA (named)
Related pages
Pages on our site about what this document covers: EPA · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-2440 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 4 pages. Production numbers UCC 015841 to UCC 015707.
Cite this document
J. E. Sanders (Engineering, Manufacturing and Technology Services, Central Engineering, Technical Center, South Charleston, WV). “J. E. Sanders to B. G. Perry on Recommended C&P Program to Phase Out Asbestos-Containing Materials in the Workplace.” October 14, 1986. Union Carbide documents, UC-2440, Bates UCC 015841 to UCC 015707. Union Carbide Corporation, Engineering, Manufacturing and Technology Services, Central Engineering. AsbestosClaims.Law Library, ACL Doc 17419. https://asbestosclaims.law/library/17419.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.