No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

J. E. Sanders to L. E. Calvert, S. W. Clark, G. B. Elder and R. W. Engle on the Recommended C&P Program to Phase Out Asbestos-Containing Materials in the Workplace (1986)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

One-page internal Union Carbide memo in which J. E. Sanders transmitted to a team a copy of their recommendation on asbestos usage, which he had sent to Bob Perry. The memo thanked the team and said he would keep them posted as the recommendation proceeded. The attachment is not included, and the page carries handwritten notations and a received stamp dated Oct 20, 1986.

Author
J. E. Sanders (Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center)
Published by
Union Carbide Corporation, Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center (South Charleston, WV)
Series
Union Carbide documents, UC-2481
Date
October 16, 1986
Number
Bates UCC 015870
Library no.
ACL Doc 17460 · asbestosclaims.law/library/17460
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2481 · 1 pages · 32 KB

People and organizations

From J. E. Sanders (Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center) to Mr. L. E. Calvert; Mr. S. W. Clark; Mr. G. B. Elder; Mr. R. W. Engle; Mr. C. C. Neely (copy).

Pages on our site about what this document covers: West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-2481 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 1 page. Production numbers UCC 015870.

Cite this document

J. E. Sanders (Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center). “J. E. Sanders to L. E. Calvert, S. W. Clark, G. B. Elder and R. W. Engle on the Recommended C&P Program to Phase Out Asbestos-Containing Materials in the Workplace.” October 16, 1986. Union Carbide documents, UC-2481, Bates UCC 015870. Union Carbide Corporation, Engineering, Manufacturing, and Technology Services, Central Engineering, Technical Center (South Charleston, WV). AsbestosClaims.Law Library, ACL Doc 17460. https://asbestosclaims.law/library/17460.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.