No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Proposed Procedure for Handling, Removing and Disposing of Asbestos-Containing Insulation, with Handwritten Note on Sending a Draft to Heilman in Maintenance

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

A draft plant procedure titled 'Asbestos Handling' sets out precautions for handling, installing, removing and disposing of insulation containing asbestos. It covers barricade tape, caution signs, hazardous work permits, wet handling, respirators, protective clothing, housekeeping and labeled waste containers. A handwritten note on page 1 says the attached was sent to Heilman in Maintenance as a second draft of a proposed procedure and that the writer believes there is a plant deficiency in this area. Pages 1 and 2 are the same text, and page 1 is a partly cut-off copy carrying the note.

Author
Art (writer of the handwritten note on page 1 (signature appears to read 'Art'; read from the image))
Published by
Union Carbide Corporation
Series
Union Carbide documents, UC-2938
Number
Bates UCC 016237 to UCC 016239
Library no.
ACL Doc 17792 · asbestosclaims.law/library/17792
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-2938 · 3 pages · 155 KB

People and organizations

From Art (writer of the handwritten note on page 1 (signature appears to read 'Art'; read from the image)) to Wayne (first name partly illegible) (addressee of the handwritten note; the name is a guess from the image).

About this copy

This is document UC-2938 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 3 pages. Production numbers UCC 016237 to UCC 016239.

Cite this document

Art (writer of the handwritten note on page 1 (signature appears to read 'Art', read from the image)). “Proposed Procedure for Handling, Removing and Disposing of Asbestos-Containing Insulation, with Handwritten Note on Sending a Draft to Heilman in Maintenance.” Union Carbide documents, UC-2938, Bates UCC 016237 to UCC 016239. Union Carbide Corporation. AsbestosClaims.Law Library, ACL Doc 17792. https://asbestosclaims.law/library/17792.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.