You don't need the product names or old records. No fee unless we recover compensation for your family.
Work order package (Job 930-38037A) released 12-10-86 for stripping badly deteriorated asbestos insulation from six Methyls columns at the Sistersville plant and re-insulating some with calcium silicate. It includes a work description, insulation schedules, a safety review form, an insulation specification, a scaffold procedure, and the plant's asbestos handling, removal and disposal procedure (Section II-13) with an audit checklist.
- Author
- D. L. Estep (Issuer of the work package (Project Coordinating Eng. per distribution list))
- Published by
- Union Carbide Corporation, Sistersville, WV Plant
- Series
- Union Carbide documents, UC-2959
- Date
- December 10, 1986
- Number
- Bates UCC 016312 to UCC 016327
- Library no.
- ACL Doc 17813 · asbestosclaims.law/library/17813
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-2959 · 16 pages · 719 KB
What the document holds
- Page 1: Work order / package transmittal form for Methyls Columns Upgrade - Insulation, with distribution list and general notes
- Page 2: Work description (page 1 of 3)
- Pages 3-4: Equipment and piping insulation schedules I and II (pages 2-3 of 3)
- Page 5: Safety Review form (930's only)
- Page 6: Standard Practice, Thermal Insulation specification 2M (June 1986)
- Pages 7-11: Plant Safety and Health Procedures Manual Section II-10, provisions for erecting and using scaffolds
- Pages 12-15: Safety and Health Procedures Manual Section II-13, handling, installing, removing and disposing of asbestos-containing material
- Page 16: Audit checklist for removal and handling of asbestos materials
People and organizations
From D. L. Estep (Issuer of the work package (Project Coordinating Eng. per distribution list)) to J. E. Boley (Maintenance); B. E. Bess (Field Const.); R. L. Forester (Operating Dept. Contact).
- D. L. Estep (author)
- B. E. Bess (recipient)
- Jack Boley (recipient)
- R. L. Foster (recipient)
- Union Carbide Corporation (its organization)
- WV Plant (its organization)
- Ceel-Co (named)
- Childers Products Company (named)
- Foster Div. of H. B. Fuller Co (named)
- Johns-Manville (named)
- L&L Coating Corp (named)
- Owens-Corning Fiberglas (named)
- Plastic Coatings Corp (named)
- Silanes Department (named)
- Topline Products Inc (named)
- Vimasco Corporation (named)
Related pages
Pages on our site about what this document covers: Johns-Manville · Owens-Corning Fiberglas · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-2959 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 16 pages. Production numbers UCC 016312 to UCC 016327.
Cite this document
D. L. Estep (Issuer of the work package (Project Coordinating Eng. per distribution list)). “Methyls Columns Upgrade Work Package for Removal of Deteriorated Asbestos Insulation at the Sistersville, WV Plant, with Plant Asbestos Handling Procedure.” December 10, 1986. Union Carbide documents, UC-2959, Bates UCC 016312 to UCC 016327. Union Carbide Corporation, Sistersville, WV Plant. AsbestosClaims.Law Library, ACL Doc 17813. https://asbestosclaims.law/library/17813.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.