You don't need the product names or old records. No fee unless we recover compensation for your family.
A June 2, 1987 work order transmittal from Danbury forwarding a capital work order request for Phase 1 of an asbestos insulation upgrade at the South Charleston Plant. The attached 8-page capital work order describes the project as an occupational health measure to comply with OSHA standards, with a $900,000 capital and $270,000 expense estimate, cost allocations, and approval signatures.
- Author
- M. G. Dwyer
- Published by
- Union Carbide Corporation, Specialty Chemicals Division
- Series
- Union Carbide documents, UC-3133
- Date
- June 2, 1987
- Number
- Bates UCC 019727 to UCC 019735
- Library no.
- ACL Doc 17972 · asbestosclaims.law/library/17972
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-3133 · 9 pages · 360 KB
What the document holds
- Page 1: Transmittal memo dated June 2, 1987 from M. G. Dwyer forwarding the work order request for review and approval, with routing stamps
- Page 2: Capital Work Order 930-2057 face sheet (job NP-8009) with justification, cost summary, distribution list and approval signatures
- Pages 3-5: Objective, justification, environmental/health/safety considerations, project plan, asbestos project criteria, team and schedule
- Page 6: Cost estimate and allocation of costs to divisions
- Page 7: Basis for audit review
- Page 8: Table 1: preliminary work breakdown by plant area
- Page 9: Table 2: division and profit center allocation breakdown
People and organizations
From M. G. Dwyer to D. Liebeskind; D. G. Moshier; J.E. McKeon; J.C. Soviero.
- M. G. Dwyer (author)
- D. Liebeskind (recipient)
- J. E. McKeon (recipient)
- D. G. Moshier (recipient)
- J. C. Soviero (recipient)
- Specialty Chemicals Division (its organization)
- Union Carbide Corporation (its organization)
- Engineering Department (named)
- Engineering, Manufacturing, and Technology Services (Union Carbide) (named)
- EPA (named)
- Maintenance Department (named)
- OSHA (named)
- Plant Engineering (named)
- Plant Environmental Protection Department (named)
- Plant Safety Department (named)
- Powerhouse Equipment Company (named)
Related pages
Pages on our site about what this document covers: EPA · OSHA · OSHA Asbestos Standard · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-3133 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 9 pages. Production numbers UCC 019727 to UCC 019735.
Cite this document
“M. G. Dwyer Transmittal and Capital Work Order for Asbestos Insulation Upgrade, Phase I, South Charleston Plant.” June 2, 1987. Union Carbide documents, UC-3133, Bates UCC 019727 to UCC 019735. Union Carbide Corporation, Specialty Chemicals Division. AsbestosClaims.Law Library, ACL Doc 17972. https://asbestosclaims.law/library/17972.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.