You don't need the product names or old records. No fee unless we recover compensation for your family.
Project scope document for Building 303 transitional operation and demolition at the South Charleston Plant. It describes temporary drum-handling facilities and the removal and disposal of asbestos-containing transite siding by an abatement contractor, with the removal methods, air-sampling requirements and approval signatures. Two plot-plan drawings are attached.
- Author
- T. G. Huff (Project Manager, South Charleston Plant Engineering)
- Published by
- Union Carbide Corporation, Specialty Chemicals Division, South Charleston Plant Engineering
- Series
- Union Carbide documents, UC-3160
- Date
- September 1, 1987
- Number
- Bates UCC 000230 to UCC 000235
- Library no.
- ACL Doc 17995 · asbestosclaims.law/library/17995
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-3160 · 8 pages · 375 KB
People and organizations
From T. G. Huff (Project Manager, South Charleston Plant Engineering) to D. J. McNeil (Engineering Manager); C. R. Rotthoff (SC Div Personnel Safety Manager); M. J. Shoger (Plant Safety Department); D. R. Stokely (Production Department Head); J. L. Worstell (Environmental Protection Dept.).
- T. G. Huff (author)
- D. J. McNeil (recipient)
- Chuck Rotthoff (recipient)
- M. J. Shoger (recipient)
- D. R. Stokely (recipient)
- J. L. Worstell (recipient)
- Specialty Chemicals Division (its organization)
- Union Carbide Corporation (its organization)
- Chemical Mixing Department (named)
- DOT (named)
- Federal EPA (named)
- OSHA (named)
- Plant 514 Environmental Protection Department (named)
- Plant Safety Department (named)
- South Charleston Plant Engineering (named)
- WVAPCC (named)
Related pages
Pages on our site about what this document covers: NESHAP · OSHA · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-3160 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 8 pages. Production numbers UCC 000230 to UCC 000235.
Cite this document
T. G. Huff (Project Manager, South Charleston Plant Engineering). “T. G. Huff to D. J. McNeil and Others: Project Scope Document for B-303 Transitional Operation/Demolition Phase II, South Charleston Plant.” September 1, 1987. Union Carbide documents, UC-3160, Bates UCC 000230 to UCC 000235. Union Carbide Corporation, Specialty Chemicals Division, South Charleston Plant Engineering. AsbestosClaims.Law Library, ACL Doc 17995. https://asbestosclaims.law/library/17995.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.