You don't need the product names or old records. No fee unless we recover compensation for your family.
Cover letter from the SHARE Coordinator at the South Charleston Plant to T. G. Swanson transmitting findings of a SHARE inspection held July 29, 1987. It sets a 90-day deadline to address deficiencies and 30-day progress updates. Three attached handwritten South Charleston Plant Safety/Health Audit Team's Report forms follow; page 2 lists items on exposed asbestos and insulation at a boiler location (Location 151) with corrective actions.
- Author
- S. B. Kovach (SHARE Coordinator, Safety and Health Department)
- Published by
- Union Carbide Corporation, South Charleston Plant, Safety and Health Department
- Series
- Union Carbide documents, UC-3628
- Date
- July 29, 1987
- Number
- Bates UCC 008470 to UCC 008473
- Library no.
- ACL Doc 18354 · asbestosclaims.law/library/18354
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-3628 · 4 pages · 172 KB
What the document holds
- Page 1: Letter from S. B. Kovach to T. G. Swanson on SHARE inspection results, with progress update schedule
- Pages 2-4: Handwritten Safety/Health Audit Team's Report forms listing substandard conditions and corrective actions
People and organizations
From S. B. Kovach (SHARE Coordinator, Safety and Health Department) to T. G. Swanson; G. F. Painter (copy of letter only); M. J. Shoger (copy of letter only).
- S. B. Kovach (author)
- T. G. Swanson (recipient)
- G. F. Painter (copied)
- M. J. Shoger (copied)
- South Charleston Plant (its organization)
- Union Carbide Corporation (its organization)
- South Charleston Plant Safety and Health Department (named)
Related pages
Pages on our site about what this document covers: West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-3628 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 4 pages. Production numbers UCC 008470 to UCC 008473.
Cite this document
S. B. Kovach (SHARE Coordinator, Safety and Health Department). “S. B. Kovach to T. G. Swanson Transmitting SHARE Inspection Results, with Audit Team Reports, South Charleston Plant.” July 29, 1987. Union Carbide documents, UC-3628, Bates UCC 008470 to UCC 008473. Union Carbide Corporation, South Charleston Plant, Safety and Health Department. AsbestosClaims.Law Library, ACL Doc 18354. https://asbestosclaims.law/library/18354.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.