No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

W. D. Bradbury, Jr. to J. F. Flynn and A. Walker Transmitting Outline of Project for Asbestos Insulation Upgrade, Phase I, Sistersville Plant (1986)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

A September 30, 1986 cover memo transmits an Outline of Project for Phase I of an asbestos insulation upgrade at the Sistersville, West Virginia plant. The upgrade was meant to bring the plant into compliance with the OSHA asbestos standard 1910.1001. It would cover about 60% of the plant's asbestos insulation, with $1,500M capital and $600M expense, executed from 4Q86 through 2Q89. The attached outline, budget assignment form, a June 1986 memo and handwritten pages give scope, priorities, schedule and costs.

Author
W. D. Bradbury, Jr. (Engineering (Sistersville Plant Engineering))
Published by
Union Carbide Corporation, Specialty Chemicals Division, Technical Center, South Charleston, West Virginia
Series
Union Carbide documents, UC-4001
Date
September 30, 1986
Number
Bates UCC 020035 to UCC 020048
Library no.
ACL Doc 18630 · asbestosclaims.law/library/18630
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-4001 · 14 pages · 311 KB

What the document holds

  • Pages 1-2: Memo of September 30, 1986 from W. D. Bradbury, Jr. to J. F. Flynn and A. Walker transmitting the Outline of Project for the Phase I insulation upgrade, with endorsements listed
  • Page 3: Title page of the Outline of Project, Insulation Upgrade - Phase I, Sistersville Plant Engineering, dated September 29, 1986
  • Pages 4-10: Outline of Project text: table of contents, introduction, summary, objectives, facilities and area priorities, health and safety considerations, project plan, schedule and cost estimate
  • Page 11: SCD Division Working Budget Capital Project Assignment form for Asbestos Insulation Replacement, Sistersville Plant (9/86)
  • Page 12: Sistersville Plant Engineering memo of June 25, 1986 on the Sistersville Plant Insulation Upgrade, circulating the Draft Outline of Project, with handwritten annotations
  • Page 13: Danbury Hilton Inn and Conference Center item bearing a handwritten note
  • Page 14: Handwritten notes on asbestos insulation upgrade project cost estimates (scope, completion target)

People and organizations

From W. D. Bradbury, Jr. (Engineering (Sistersville Plant Engineering)) to J. F. Flynn; A. Walker.

Pages on our site about what this document covers: Connecticut Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage · EPA · OSHA · OSHA Asbestos Standard · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-4001 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 14 pages. Production numbers UCC 020035 to UCC 020048.

Cite this document

“W. D. Bradbury, Jr. to J. F. Flynn and A. Walker Transmitting Outline of Project for Asbestos Insulation Upgrade, Phase I, Sistersville Plant.” September 30, 1986. Union Carbide documents, UC-4001, Bates UCC 020035 to UCC 020048. Union Carbide Corporation, Specialty Chemicals Division, Technical Center, South Charleston, West Virginia. AsbestosClaims.Law Library, ACL Doc 18630. https://asbestosclaims.law/library/18630.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.