No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project (1986)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

A November 7, 1986 transmittal memo from Joseph F. Dodd circulating the Outline of Project for a plantwide asbestos insulation upgrade at the South Charleston Plant, with a handwritten note asking who would perform the work. The attached outline describes scope, schedule, a $3.3MM capital and $1.4MM expense budget, and OSHA compliance, followed by an October 1986 health, safety and environmental review, a memo on the revised OSHA asbestos standard, checklists, and cost allocation tables.

Author
Joseph F. Dodd (South Charleston Plant Engineering, Specialty Chemicals Division)
Published by
Union Carbide Corporation, Specialty Chemicals Division, South Charleston Plant Engineering
Series
Union Carbide documents, UC-4004
Date
November 7, 1986
Number
Bates UCC 020072 to UCC 020098
Library no.
ACL Doc 18633 · asbestosclaims.law/library/18633
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-4004 · 27 pages · 768 KB

What the document holds

  • Page 1: Memo from Joseph F. Dodd, Nov. 7, 1986, transmitting the Insulation Upgrade Outline of Project, with handwritten note
  • Pages 2-9: Outline of Project, South Charleston Plant Insulation Upgrade (introduction, objectives, facilities, health and safety, schedule, cost estimate, allocations)
  • Pages 10-12: Oct. 30, 1986 memo from H. W. Wegert and G. M. Whipple, Health, Safety and Environmental Review, with HS&E review summary
  • Pages 13-16: Oct. 28, 1986 memo from T. E. Hanning to H. W. Wegert reviewing plant procedures for asbestos removal and disposal under the revised OSHA standard
  • Pages 17-25: Checklists (HSE Checklist, Capital Project Proposal), mostly garbled or inverted in OCR
  • Pages 26-27: Cost allocation tables by profit center for tenant divisions

People and organizations

From Joseph F. Dodd (South Charleston Plant Engineering, Specialty Chemicals Division) to D. A. Gosselin; R. G. Link; S. Rossi; E. D. Southard; J. L. Worstell.

Pages on our site about what this document covers: EPA · OSHA · OSHA Asbestos Standard · West Virginia Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-4004 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 27 pages. Production numbers UCC 020072 to UCC 020098.

Cite this document

Joseph F. Dodd (South Charleston Plant Engineering, Specialty Chemicals Division). “J. F. Dodd to D. A. Gosselin and Others Transmitting the South Charleston Plant Insulation Asbestos Upgrade Outline of Project.” November 7, 1986. Union Carbide documents, UC-4004, Bates UCC 020072 to UCC 020098. Union Carbide Corporation, Specialty Chemicals Division, South Charleston Plant Engineering. AsbestosClaims.Law Library, ACL Doc 18633. https://asbestosclaims.law/library/18633.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.