No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

T. J. Kagetsu to W. C. Thurber Transmitting J. J. Militello's Design Memo and Cost Estimate for a Wetted Supervisbestos Circuit at King City (1976)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

A cover memo from T.J. Kagetsu to W.C. Thurber transmitting a preliminary engineering study for producing "Wetted Supervisbestos" at the King City plant. The attached Design Memo No. 1 by J.J. Militello (August 13, 1976) gives the design criteria, process description, equipment list, flowsheet and an order-of-magnitude capital cost estimate of $255,000.

Author
T.J. Kagetsu (Technology Department, Metals Division); J.J. Militello (Technology Department-Engineering, Niagara Falls, New York (author of attached design memo))
Published by
Union Carbide Corporation, Metals Division, Technology Department
Series
Union Carbide documents, UC-4288
Date
August 20, 1976
Number
Bates UCC 011000 to UCC 011005
Library no.
ACL Doc 18876 · asbestosclaims.law/library/18876
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-4288 · 7 pages · 128 KB

What the document holds

  • Page 1: Cover memo from T.J. Kagetsu to W.C. Thurber and distribution, August 20, 1976, with handwritten annotation
  • Pages 2-3: Design Memo No. 1 (J.J. Militello, August 13, 1976): scope, design criteria, process description, equipment location, cost estimate summary
  • Page 4: Preliminary Wetted Supervisbestos flowsheet
  • Page 5: Table I, equipment list
  • Page 6: Table II, order of magnitude cost estimate ($255,000 total)

People and organizations

From T.J. Kagetsu (Technology Department, Metals Division); J.J. Militello (Technology Department-Engineering, Niagara Falls, New York (author of attached design memo)) to Mr. W.C. Thurber (UCC-Metals Division, 270 Park Avenue, New York); E.W. Kantz/File; R.J. Klotzbach; F.H. Larrison; O.J. Malacarne; J.L. Meyers; J.J. Militello; H.B. Rhodes; R.G. Woolery.

Pages on our site about what this document covers: Calidria · California Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage · New York Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.

About this copy

This is document UC-4288 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 7 pages. Production numbers UCC 011000 to UCC 011005.

Cite this document

T.J. Kagetsu (Technology Department, Metals Division), J.J. Militello (Technology Department-Engineering, Niagara Falls, New York (author of attached design memo)). “T. J. Kagetsu to W. C. Thurber Transmitting J. J. Militello's Design Memo and Cost Estimate for a Wetted Supervisbestos Circuit at King City.” August 20, 1976. Union Carbide documents, UC-4288, Bates UCC 011000 to UCC 011005. Union Carbide Corporation, Metals Division, Technology Department. AsbestosClaims.Law Library, ACL Doc 18876. https://asbestosclaims.law/library/18876.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.