No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Leo J. LaFrance to C. Frankenberger on Asbestos Air Sampling at the Linde Division Speedway Factory Acetylene Cylinder Filling Building (1974)

You don't need the product names or old records. No fee unless we recover compensation for your family.

Call 833-4-ASBESTOS Request a review

Letter from an industrial hygienist reporting a follow-up survey on August 6-7, 1974 of the acetylene cylinder filling building at the Speedway Factory in Indianapolis, with an attached table of asbestos air sample results. It reported readings above the ceiling limit while the shredder exhaust blower was inoperative, readings at the limit after repair, and suggestions for further monitoring.

Author
Leo J. LaFrance (Industrial Hygienist, Medical Department)
Published by
Union Carbide Corporation, Linde Division, Medical Department
Series
Union Carbide documents, UC-4350
Date
August 23, 1974
Number
Bates A21695 to UCC 009405
Library no.
ACL Doc 18928 · asbestosclaims.law/library/18928
Rights
A document from asbestos litigation, published for research and historical study.

Read or download

Read online Download the PDF Document UC-4350 · 5 pages · 111 KB

People and organizations

From Leo J. LaFrance (Industrial Hygienist, Medical Department) to Mr. C. Frankenberger (Linde Division, Speedway Factory, Indianapolis, Indiana); Mr. J. E. Bertrand (copy recipient); Mr. K. Earl (copy recipient); Mr. D. Jenkins (copy recipient); Mr. R. M. Neary (copy recipient); Mr. R. Oldford (copy recipient); Mr. H. L. Phillips (copy recipient); Mr. L. G. Suelter (copy recipient); Dr. J. J. Welsh (copy recipient); Dr. K. S. Lane (copy recipient).

Pages on our site about what this document covers: Air Sampling · Industrial Hygiene.

About this copy

This is document UC-4350 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 5 pages. Production numbers A21695 to UCC 009405.

Cite this document

Leo J. LaFrance (Industrial Hygienist, Medical Department). “Leo J. LaFrance to C. Frankenberger on Asbestos Air Sampling at the Linde Division Speedway Factory Acetylene Cylinder Filling Building.” August 23, 1974. Union Carbide documents, UC-4350, Bates A21695 to UCC 009405. Union Carbide Corporation, Linde Division, Medical Department. AsbestosClaims.Law Library, ACL Doc 18928. https://asbestosclaims.law/library/18928.

ACL Doc numbers and their short links never change. See how to cite the Library.

Talk with an asbestos lawyer

Start with what you remember, and we'll take it from there.

This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.