You don't need the product names or old records. No fee unless we recover compensation for your family.
Letter to the Texas Air Control Board giving notice, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from 180 square feet of equipment in Building 218 at the Texas City plant, from June 8 to July 8, 1987. The attached plant form, prepared by C. L. Garland, describes the work as stripping insulation from a 25% caustic storage/feed tank before cleaning and painting.
- Author
- G. L. Rivera (Health, Safety & Environmental Affairs, Solvents & Coatings Materials (from letterhead; no title given with the signature))
- Published by
- Union Carbide Corporation, Health, Safety & Environmental Affairs, Solvents & Coatings Materials, Texas City
- Series
- Union Carbide documents, UC-4738
- Date
- May 21, 1987
- Number
- Bates UCTC 18885 to UCTC 18886
- Library no.
- ACL Doc 19262 · asbestosclaims.law/library/19262
- Rights
- A document from asbestos litigation, published for research and historical study.
Read or download
Read online Download the PDF Document UC-4738 · 3 pages · 82 KB
What the document holds
- Page 1: Letter from G. L. Rivera to Eli Bell, Texas Air Control Board, giving renovation notification for asbestos insulation removal (May 21, 1987)
- Page 2: Plant Procedure I-3-6 Attachment #1: Notice of Intention to Demolish or Renovate a Structure or Facility Containing Asbestos Material, prepared by C. L. Garland (May 21, 1987)
People and organizations
From G. L. Rivera (Health, Safety & Environmental Affairs, Solvents & Coatings Materials (from letterhead; no title given with the signature)) to Mr. Eli Bell (Executive Director, Texas Air Control Board).
- Gilberto L. Rivera (author)
- Eli Bell (recipient)
- Union Carbide Corporation (its organization)
- EP Department (named)
- GCACD (named)
- Gulf Coast Waste Disposal Authority (named)
- Texas Air Control Board (named)
- Texas City Plant (named)
Related pages
Pages on our site about what this document covers: Texas Asbestos Exposure Sites: Worksites, Industries, and Trust Coverage.
About this copy
This is document UC-4738 of the Union Carbide documents, documents produced and used as evidence in asbestos lawsuits against Union Carbide, 3 pages. Production numbers UCTC 18885 to UCTC 18886.
Cite this document
G. L. Rivera (Health, Safety & Environmental Affairs, Solvents & Coatings Materials (from letterhead, no title given with the signature)). “G. L. Rivera to Eli Bell, Texas Air Control Board, Notifying of Asbestos Insulation Removal at the Texas City Plant.” May 21, 1987. Union Carbide documents, UC-4738, Bates UCTC 18885 to UCTC 18886. Union Carbide Corporation, Health, Safety & Environmental Affairs, Solvents & Coatings Materials, Texas City. AsbestosClaims.Law Library, ACL Doc 19262. https://asbestosclaims.law/library/19262.
ACL Doc numbers and their short links never change. See how to cite the Library.
Talk with an asbestos lawyer
Start with what you remember, and we'll take it from there.
This page is provided for general informational purposes and does not constitute legal advice. Every asbestos case turns on its own facts, exposure history, diagnosis, deadlines, available evidence, and applicable law. Reviewing this page does not create an attorney-client relationship. For advice about your specific situation, call 833-4-ASBESTOS for a free case review.