No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

9 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · September 30, 1983

    D. W. Moody, Jr. to C. D. Twait on Asbestos in Valve Packing and Gaskets at Carbide Plants, with Twait's Request and Central Engineering Asbestos Fibers Write-up (1983)

    …W. Moody, Jr. to C. D. Twait, Sept. 30, 1983, on asbestos in valve packing and gaskets in Carbide plants Handwritten memo from G. D. Twait to E. C. Powell, Jr., Sept. 23, 1983, requesting comments…

  2. Company document · Union Carbide documents · March 21, 1984

    G. D. Twait to Wayne Williams on November 1983 Revisions to SH-256, Removal and Handling of Asbestos-Containing Insulation Material (1984)

    A handwritten 1984 note from G. D. Twait to Wayne Williams confirming that the asbestos permissible exposure limit in the November 1983 revision of SH-256 would stay at 0.5 fibers/cc, with attached material. The attachments are the OSHA emergency…

  3. Company document · Union Carbide documents · November 21, 1986

    D. C. Kirby to D. G. Beddow Transmitting the Sistersville Polymers I Operational Safety/Health Survey (1986)

    A November 1986 memorandum transmitting the final report of an Operational Safety/Health Survey of the Sistersville Polymers I unit, conducted October 20-24, 1986. The attached report cover and one findings page (page 13) follow, including a…

  4. Company document · Union Carbide documents · November 21, 1986

    D. C. Kirby to S. E. Illikainen Transmitting the Operations Safety/Health Survey of the Institute No. 2 Power House, with Excerpt on Asbestos Insulation (1986)

    Memorandum transmitting the final report of an Operations Safety/Health Survey of the Institute No. 2 Power House, conducted October 6-10, 1986. The exhibit also includes report page 20, which lists findings on arsenic and lead exposure, polycyclic…

  5. Company document · Union Carbide documents · July 23, 1987

    D. C. Kirby to R. R. Burns Transmitting the Operational Safety/Health Survey of the Institute Plant Distribution Facilities (1987)

    A July 23, 1987 memorandum from D. C. Kirby to R. R. Burns, with a long copy list, transmitting the final report of a June 8-12, 1987 operational safety/health survey of the Distribution Facilities at the Institute Plant. The attached report (title…

  6. Company document · Union Carbide documents · September 18, 1987

    D. C. Kirby to S. E. Illikainen Transmitting the Operational Safety/Health Survey of the No. 1 Power House, Institute Plant (1987)

    A cover memo from D. C. Kirby transmitting the final report of a July 27-31, 1987 operational safety/health survey of the No. 1 Power House at the Institute, West Virginia plant, followed by the report's title page and one page (page 11) of 'Less…

  7. Company document · Union Carbide documents · September 21, 1984

    Preliminary Report: Operational Safety/Health Survey of the Moore HPPE Unit, by A. L. Agarwal, J. M. Poulson, R. R. Rochon and G. D. Twait (1984)

    Cover page and one interior page (report page 9) of a preliminary safety/health survey of the Moore HPPE unit. The interior page says asbestos insulation in the sampler shed was the only potential source of asbestos fiber inhalation in the unit and…

  8. Company document · Union Carbide documents · July 1987

    Operational Safety/Health Survey of No. 1 Power House, Institute Plant, by R. S. Holmes, D. C. Kirby, R. W. Light and L. J. Sydenstricker (1987)

    Excerpt (cover page and page 11) of a safety/health survey of the No. 1 Power House at the Institute Plant, conducted July 27-31, 1987. Page 11 lists 'less serious health concerns': exposed and deteriorated asbestos insulation that was not labeled,…

  9. Company document · Union Carbide documents · February 1984

    Final Report: Operational Safety/Health Survey of No. 3 Power House, Texas City Plant (1984)

    Final report of an operational safety/health survey of the No. 3 Power House at the Texas City plant, conducted February 13-17, 1984. It found no imminent hazards, listed two major equipment concerns and several less serious concerns, and included…