Company document · Union Carbide documents · January 31, 1986
A. P. Yalcinkaya to Texas Air Control Board on Notification of Asbestos Insulation Removal at Texas City Plant (1986)
Exhibit consisting of a handwritten fax cover sheet, a January 31, 1986 letter notifying the Texas Air Control Board of planned removal of asbestos insulation from four amine solution heat exchangers at the Texas City plant, and a blank…
-
Company document · Union Carbide documents · August 16, 1978
A. P. Yalcinkaya to L. P. Berti on Demolition of Buildings #20 and #21 at Texas City, with Attached Asbestos Standard, Monitoring Report and NIOSH Nickel Criteria Document (1978)
Internal Union Carbide memo from A. P. Yalcinkaya to Dr. L. P. Berti recommending that demolition contractors at Texas City Buildings #20 and #21 be warned of hazards and told of the OSHA asbestos standard requirements…
-
Company document · Union Carbide documents · August 17, 1987
A. P. Yalcinkaya to Eli Bell, Texas Air Control Board, on Asbestos Insulation Removal Notification at Texas City (1987)
Letter of August 17, 1987 from A. P. Yalcinkaya to the Texas Air Control Board giving notice under 40 CFR 61.146 of planned removal of insulation from 1200 linear feet of pipe near Bldg. 16 at the Texas City plant. Removal was scheduled for…
-
Company document · Union Carbide documents · March 23, 1977
A. P. Yalcinkaya to D. L. Engle on OSHA Inspection of Building 74 at the Texas City Plant (1977)
Memo-style letter, marked confidential, reporting an OSHA Compliance Officer's visit to the Texas City Plant on March 18, 1977. The visit followed a complaint about the Building 74 conference-lunch room and locker room sanitation. The letter says…
-
Company document · Union Carbide documents · January 31, 1986
A. P. Yalcinkaya to Bill Stewart, Texas Air Control Board, Renovation Notification for Asbestos Insulation Removal at Texas City Plant (1986)
…Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove about 300 square feet of insulation from four amine solution heat exchangers at Bldg. 57 of its Texas City plant. Removal was…