14 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · June 22, 1989
Union Carbide Texas City Plant Asbestos Renovation Notices for Roof Removal on Building 47 (1989)
Texas Air Control Board Asbestos Demolition/Renovation Notification Form for Union Carbide, Texas City, signed by Andrew F. Jackson, June 22, 1989 (UCTC 18162) Handwritten Union Carbide Texas City Plant 'Notice of Intention to Demolish or…
-
Company document · Union Carbide documents · 1989
Handwritten Note to 'Drew' on Asbestos Notification Filing, with Texas Air Control Board Asbestos Renovation Notification Forms for Union Carbide's Texas City Plant (1989)
…file can serve as the central asbestos notification file. It is followed by two Texas Air Control Board asbestos demolition/renovation notification forms for Union Carbide's Texas City plant, signed by Industrial Hygienist Andrew F…
-
Company document · Union Carbide documents · December 26, 1996
Texas Department of Health Demolition/Renovation Notification Forms for Union Carbide Texas City Plant Buildings 122 and 94, with Internal Notices (1996-1997)
…Demolition/Renovation Notification Form for Building 122 (transite panel removal), signed 12/26/96 Union Carbide Texas City Plant internal Notice of Intention to Demolish or Renovate, largely handwritten (Building 122) Page with no OCR text…
-
Company document · Union Carbide documents · 1997
Texas Department of Health Asbestos Demolition/Renovation Notifications and Plant Procedure Form for Union Carbide Texas City Plant (1997-1998)
…F. Jackson 8/13/97; 350 linear ft (UCTC 18328-18329) Union Carbide Texas City Plant Safety and Health Procedure SH-55 'Notice of Intention to Demolish or Renovate' form, mostly handwritten, for the same Bldg…
-
Company document · Union Carbide documents · September 25, 1989
Texas Air Control Board Asbestos Demolition/Renovation Notification for No. 6 Boiler Economizer, Union Carbide Texas City Plant, with Plant Notice of Intention (1989)
…ft. of asbestos from the lower section of the No. 6 Boiler Economizer at Union Carbide's Texas City plant. The removal contractor was Catalytic Industrial Maintenance Company. It is followed by a plant-procedure attachment…
-
Company document · Union Carbide documents · August 14, 1989
Union Carbide Texas City Plant Notification to Texas Air Control Board of Emergency Asbestos Removal from #2 SRC Reflux Drum (1989)
…signed by Andrew F. Jackson, Aug. 14, 1989 Union Carbide Texas City Plant notice of intention to demolish or renovate a structure containing asbestos (Plant Procedure SH-5.6, Attachment #1), prepared by D. R. Schoen…
-
Company document · Union Carbide documents · December 1989
Union Carbide Texas City Plant Asbestos Demolition/Renovation Notices and Texas Air Control Board Forms (1989)
Union Carbide Texas City Plant internal Notice of Intention to Demolish or Renovate a Structure or Facility Containing Asbestos Material (Attachment 3, Plant Procedure), handwritten, No. 1 Powerhouse Texas Air Control Board Asbestos Demolition/Renovation Notification…
-
Company document · Union Carbide documents · November 1, 1989
Andrew F. Jackson to R. A. Johnson on Asbestos Sample from Building 103 at Texas City Plant (1989)
Short memo from the Industrial Hygiene department at the Texas City Plant reporting on a sample taken from the basement light fixtures of Building 103. It states that analysis showed the sample contains asbestos and directs further inquiries to Dick…
-
Company document · Union Carbide documents · July 16, 1991
A. F. Jackson to J. A. Aaron and Others on the Texas Department of Health Inspection of Dykon Services at Texas City (1991)
Memo from A. F. Jackson describing a routine July 12, 1991 inspection of the Texas City plant by Barbara Key of the Texas Department of Health, directed at Dykon Services, Inc., the asbestos abatement contractor at Bldg 113. It reports that Dykon…
-
Company document · Union Carbide documents · March 27, 1990
Andrew Jackson to Bob Thomas on Asbestos in the Batchstill Column, Building 50, Texas City (1990)
One-page memo from the Industrial Hygiene Department at Texas City reporting that samples taken from the Building 50 batchstill column and analyzed on March 26 contained chrysotile and amosite asbestos. It asks that a notice-of-intention form be…
-
Company document · Union Carbide documents · June 18, 1992
Andrew F. Jackson to Robert Buchanan on Asbestos Handling Procedure for Non-Insulators at the Texas City Plant (1992)
Letter-style memo from the Texas City Plant industrial hygienist to Robert Buchanan about a final maintenance procedure for non-insulator crafts that encounter asbestos-containing material. It says Industrial Hygiene would need to do short-term…
-
Company document · Union Carbide documents · December 14, 1993
Andrew F. Jackson to James Prill (Galveston County Health District) on Notification of Nonscheduled Asbestos Renovations at Texas City (1993)
Letter notifying the Galveston County Health District that Union Carbide expected to carry out nonscheduled renovation work at its Texas City facility from January 1 to December 31, 1994, estimating removal of at least 1500 square…
-
Company document · Union Carbide documents · December 14, 1992
Andrew F. Jackson to James Prill on Notification of Nonscheduled Asbestos Renovations at Texas City (1992)
Letter notifying the Galveston County Health District that the Texas City facility expected to carry out nonscheduled renovations from January 1 to December 31, 1993. It estimated at least 1500 square feet and 1500 linear feet of regulated…
-
Company document · Union Carbide documents · November 3, 1989
R. A. Johnson Memos and Recommendations on Asbestos Gaskets in Texas City Plant Light Fixtures (1989)
Compilation of Texas City Plant papers from October-November 1989 about asbestos gaskets found in old light fixtures. It includes an electrical and control systems specialists mailing list, an Oct. 30 memo reporting the discovery, a Nov. 1…