No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

13 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · October 3, 1980

    B. L. Ingalls to W. B. DeAtley and J. J. Sibley on Air Monitoring After Clean-Up of Residential Sites in Greenfield, Lockwood and King City, with Myers to Adams on Monitoring Costs (1980)

    A four-page exhibit. Pages 1-3 are an October 3, 1980 internal memo from B. L. Ingalls with an attached excerpt of a revised post-clean-up air monitoring program for residential sites in Greenfield, Lockwood and King City, California. The memo…

  2. Company document · Union Carbide documents · March 8, 1976

    Gordon L. Dickson to Jerry Zakim (Applied Polymers of America) Sending Dust Monitoring Report for the Kearny Plant, with Talon Adhesives and AVCO Fiber Counts (1976)

    …2, 1976) by B. L. Ingalls: objective, procedure, OSHA comments, summary table Airborne Dust Counts for AVCO Corporation, Lowell, MA (dated Oct. 24, 1972): apparatus, procedure, summary of dust counts Page of tabular or handwritten data…

  3. Company document · Union Carbide documents · March 23, 1976

    B. L. Ingalls to G. L. Dickson on Corrosion Attributed to HPO Calidria Asbestos in Metal Substrate Applications at Parr Inc. and Rapid Systems Co. (1976)

    Memo updating the status of Union Carbide's investigation of corrosion problems that Parr Inc. and Rapid Systems Co. in Ohio attributed to HPO (Calidria) chrysotile used in metal substrate applications. It reports that Rapid Systems…

  4. Company document · Union Carbide documents · August 26, 1977

    E. J. Kleber to R. Hillerman (Allied Materials) on RG-244 and RG-110 Calidria, with Enclosed Roofing Compound Report (1977)

    A two-page sales letter from Edward J. Kleber to R. Hillerman at Allied Materials about Calidria RG-244 as a pyrogenic silica substitute in vinyl plastisol, with packaging and delivered-price details and a note on RG-110 against Canadian asbestos.…

  5. Company document · Union Carbide documents · February 16, 1983

    B. L. Ingalls to J. E. Walsh on the Revised Supervisbestos Product Quality Report and Viscosity Specification (1983)

    Internal correspondence from Niagara Falls reporting the outcome of a February 2, 1983 review of the report "Supervisbestos, A Review of Product Quality, Test Methods and End Use Characteristics" ahead of discussions with Montello, Inc. It states…

  6. Company document · Union Carbide documents · January 31, 1983

    B. L. Ingalls to R. E. Byrne, D. F. Kapral and F. L. Smith on Law Department Review of the Asbestos Dust Count Report Insert, with Related Memo to J. B. Rouse and Insert Text (1983)

    Exhibit of three pages. A January 31, 1983 internal memo from B. L. Ingalls says J. B. Rouse of the UCC Law Department reviewed the asbestos dust monitoring report insert on procedures, limits and conditions and recommended minor revisions. It is…

  7. Company document · Union Carbide documents · April 11, 1983

    B. L. Ingalls to R. J. Kronkhyte and J. L. Myers on NIOSH Air Monitoring Survey Results at the King City Bagging Rooms (1983)

    …L. Ingalls reporting fiber-count results from Union Carbide's own sampling during a January 1983 NIOSH air monitoring survey of the King City bagging rooms, with ceiling and TWA values for the main circuit and…

  8. Company document · Union Carbide documents · April 2, 1979

    B. L. Ingalls to J. L. Myers on Plenum Chamber Fiber Emissions of Oil-Treated Super Standard 1/8" Pellets Exposed to Ambient Conditions (1979)

    Technical Service Report, no. 2272-34, describing a test of oil-treated 1/8 inch super standard grade pellets made at King City after 38 days of weathering in an unheated warehouse. Fiber emissions were measured in a laboratory plenum chamber, and…

  9. Company document · Union Carbide documents · November 8, 1976

    B. L. Ingalls to H. B. Rhodes on Calidria Asbestos Marketing Services Work Assignments, January-October 1976, with Attached Service Lists (1976)

    Internal memo from B. L. Ingalls to Dr. H. B. Rhodes transmitting lists of work done by "Calidria" Asbestos Marketing Services from January 1 to October 31, 1976. The attachments list developmental programs and plant assistance, technical service…

  10. Company document · Union Carbide documents · May 17, 1977

    B. L. Ingalls to G. L. Dickson on Viscosity Instability in Cosmicoat's Asphaltic Tennis Court Topping Containing RG-144 (1977)

    …The lab work found that heat aging changed the viscosity because the asphalt emulsion was unstable, not because of the asbestos, and Cosmicoat was referred to a Union Carbide Chemicals & Plastics Division contact for surfactant advice.

  11. Company document · Union Carbide documents · July 17, 1980

    Gordon L. Dickson to Edward J. Abrams of Hardman Inc. on D.O.T. Classification of Calidria RG-144, with 1971 Hazardous Data Sheet (1980)

    …Abrams, enclosing the completed hazardous data sheet on 144 Hardman Incorporated hazardous-materials data sheet for Resin Grade 144, completed by Union Carbide (Dec. 14, 1971) Tables of chemical analysis and typical spectrographic analysis for RG…

  12. Company document · Union Carbide documents · May 13, 1976

    B. L. Ingalls to T. P. Norris on Dust Count Reports for Richtex, Mica Seal and Elixir Samples (1976)

    Internal letter from B. L. Ingalls to T. P. Norris commenting on enclosed dust count reports for customer samples (Richtex, Mica Seal, Elixir). Ingalls wrote that fibrous talc was difficult to distinguish from chrysotile, limiting the accuracy of…

  13. Company document · Union Carbide documents · June 17, 1982

    B. L. Ingalls to D. F. Kapral on the 6/11/82 Niagara Falls Meeting about Chemical Treatment of Asbestos to Reduce Toxicity (1982)

    …discussion of disease mechanisms, the limits of a surface-only treatment for Union Carbide's tailings and products, the regulatory climate, and the conclusion that Union Carbide would not pursue the process for the immediate future.