5 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · April 6, 1987
T. L. Grittie's Industrial Hygiene Results on Asbestos Air Monitoring at Union Carbide Plant Operations (1987)
Eight one-page "Industrial Hygiene Results" reports dated April 6-7, 1987. Each reports airborne asbestos fiber sampling taken in January and February 1987 during plant tasks, including K-40 operator duties, pipe, reactor and heater de-insulation,…
-
Company document · Union Carbide documents · April 6, 1987
T. L. Grittie Industrial Hygiene Results on Glove Bag Asbestos Insulation Removal and Transite Roof Removal (1987)
Two Industrial Hygiene Results reports dated April 6, 1987. The first reports airborne fiber sampling of insulators removing asbestos insulation by the glove bag technique at the SSP Unit, K-36, and recommends closer scrutiny of the method. The…
-
Company document · Union Carbide documents · April 6, 1987
T. L. Grittie, Industrial Hygiene Results: Asbestos Exposure Monitoring of Pipefitter, Insulators and Operators (1987)
Five one-page 'Industrial Hygiene Results' reports, each dated April 6, 1987, giving airborne asbestos fiber results from January and February 1987 sampling. The sampled jobs were removal of an asbestos gasket, glove-bag removal of asbestos from a…
-
Company document · Union Carbide documents · June 30, 1987
T. L. Grittie Industrial Hygiene Reports on Insulator Asbestos Exposure Monitoring at Monomers and Polymers II (1987)
Two industrial hygiene reports dated June 30, 1987 on airborne asbestos fiber sampling of insulators. The first covers patching insulation on a T-3 methyl chloride tank in Monomers (3/26/87 samples, all below the PEL); the second covers removing…
-
Company document · Union Carbide documents · July 1, 1987
T. L. Grittie Industrial Hygiene Results on Asbestos Monitoring of Insulators (Tank Farm 4) and the Poly I Control Room (1987)
Two industrial hygiene result sheets dated July 1, 1987, reporting asbestos air sampling done in April 1987. Page 1 covers insulators using glove bags to strip T-111 in Tank Farm 4 in Silanes, and page 2 covers the Poly I control room, where…