2 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · November 8, 1982
D. F. Kapral to T. P. Norris on Status of the Asbestos-Blend Project for Asphaltic Products, with Attached Roof Cement Sample Report (1982)
Internal memo reporting on the project to use Calidria SG-130 asbestos in asphaltic roof cement. Seven formulations were sent to Gardner Asphalt Company for testing. The memo describes plans to characterize asbestos in King City overburden, ore and…
-
Company document · Union Carbide documents · February 24, 1984
D. F. Kapral to W. C. Thurber on Prefeasibility Capital Estimates for a Plant to Produce Coalinga Alteration Products (1984)
Kapral transmitted a prefeasibility study, prepared by Darden Holt, on the capital and operating costs of a plant to calcine Coalinga ore into non-asbestos forsterite. The memo gave estimated capital costs of $14.6MM, or $12.6MM if iron was not…