4 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · August 14, 1989
Union Carbide Texas City Plant Notification to Texas Air Control Board of Emergency Asbestos Removal from #2 SRC Reflux Drum (1989)
…signed by Andrew F. Jackson, Aug. 14, 1989 Union Carbide Texas City Plant notice of intention to demolish or renovate a structure containing asbestos (Plant Procedure SH-5.6, Attachment #1), prepared by D. R. Schoen…
-
Company document · Union Carbide documents · August 14, 1989
D. R. Schoen, Notice of Intention to Renovate Asbestos-Containing Structure, #2 SRC Reflux Drum at Building 94, Texas City Plant (1989)
A completed Texas City Plant form (Plant Procedure SH-5.6, Attachment #1) giving notice of an emergency removal of a vessel, the #2 SRC reflux drum at Building 94, which contained friable asbestos material. The handwritten entries give an estimated…
-
Company document · Union Carbide documents · March 6, 1989
Texas City Plant Notice of Intention to Renovate Asbestos-Containing Steam Trap and Pipe, Prepared by D. R. Schoen (1989)
A completed Texas City Plant form (Plant Procedure SH-S.5, Attachment #1) giving notice of intention to renovate a facility containing asbestos material. It describes a vaporizer steam trap and associated pipe in Bldg. 16, about 10 linear feet of…
-
Company document · Union Carbide documents · August 14, 1989
D. R. Schoen, Notice of Intention to Renovate Asbestos-Containing Reflux Drum at Texas City Plant, Building 94 (1989)
A handwritten-in form (Plant Procedure SH-5.6, Attachment #1) giving notice of an emergency removal of friable asbestos material from the #2 SRC reflux drum at Building 94 at the Texas City Plant. The form records an estimated area, an estimated age…