4 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · March 15, 1974
E. J. Kleber to C. C. Masterman on Airborne Asbestos Fiber Counts During Riffling of SG-100 Calidria (1974)
Internal memo reporting airborne fiber counts taken March 11, 1974 in Building 166, laboratory 116, while two 67-1/2 pound bags of roll crushed SG-100 asbestos were riffled down to 8-1/2 pound fractions in a negative pressure hood. It describes the…
-
Company document · Union Carbide documents · June 22, 1973
E. J. Kleber to C. C. Masterman on Airborne Asbestos Fiber Counts in Laboratories (1973)
Internal correspondence from E. J. Kleber to C. C. Masterman transmitting results of airborne asbestos fiber counts taken in Building 166, Labs 112, 116-118 and 158, with a one-page summary of OSHA asbestos regulations. The memo said the results…
-
Company document · Union Carbide documents · December 17, 1974
E. J. Kleber to C. C. Masterman on Asbestos Fiber Counts in Building 166 Laboratories (1974)
Internal memo reporting air sampling for asbestos fibers collected December 11, 1974 in laboratories 112, 116 and 158 of Building 166, Niagara Falls. It lists four samples (three personal, one environmental) with fiber counts of 0.1 to 0.3 fibers/cc…
-
Company document · Union Carbide documents · July 16, 1974
E. J. Kleber to H. B. Rhodes on Fiber Loss on Millipore Filters Due to Handling (1974)
Internal memo reporting a test of whether Millipore filter air samples lost fibers when handled and shipped. Filters read at King City were returned to Niagara by hand-carrying, UPS or Parcel Post and recounted, and a table compares the counts. The…