No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

13 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · August 5, 1980

    Industrial Hygiene Monitoring for Asbestos: Air Samples for J. W. Greenlee and R. E. Raines, Building 707 (1980)

    Two Industrial Hygiene Monitoring for Asbestos forms dated 8/5/80, each reporting one air sample taken in Bldg. 707, Fourth Level, Cell 11, during stripping and bagging of suspected asbestos-containing insulation from about 50 feet of steam line.…

  2. Company document · Union Carbide documents · August 19, 1980

    Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Insulation Stripping in Bldg. 706 (1980)

    Two industrial hygiene monitoring forms for asbestos dated 8/19/80, each reporting one air sample taken in Bldg. 706 (West End, second and third level) while a worker stripped and bagged insulation on the G-101 autoclave and adjacent lines. The…

  3. Company document · Union Carbide documents · September 12, 1980

    G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)

    Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…

  4. Company document · Union Carbide documents · November 24, 1980

    Industrial Hygiene Monitoring for Asbestos: Powerhouse Steam Line Stripping, Bldg. 704, to W. T. Shelton (1980)

    One-page industrial hygiene monitoring form for asbestos dated 11/24/80. It reports personal air samples for R. E. Raines (.07 fibers/cc) and John Greenlee (.13 fibers/cc), each taken over 41 minutes in the Building 704 Powerhouse basement while…

  5. Company document · Union Carbide documents · November 16, 1979

    Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)

    Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…

  6. Company document · Union Carbide documents · December 5, 1978

    G. F. Hurley and M. E. Perry to Distribution on Clarification of Monitoring for Removal and Disposal of Asbestos-Containing Insulation (1978)

    A December 5, 1978 memorandum from G. F. Hurley and M. E. Perry to a distribution list clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It states that the Industrial Hygiene…

  7. Company document · Union Carbide documents · October 2, 1979

    Ruth Clise to W. T. Shelton on Asbestos Monitoring of Insulation Stripping in Building 720, South Charleston (1979)

    Internal memo reporting breathing zone air sampling taken September 19, 1979 on two workers, J. R. Monin and J. W. Greenlee, while they stripped about 40 feet of suspected asbestos steamline insulation in the basement of Building 720. It reported…

  8. Company document · Union Carbide documents · July 6, 1979

    G. W. Bott to P. W. Young on Asbestos Exposure Survey of Insulators Stripping Old Insulation at Institute Plant (1979)

    Internal Union Carbide memo reporting an industrial hygiene survey on July 2, 1979 of construction insulators stripping asbestos insulation from the #3 turbine and about thirty feet of four-inch pipe in Building 17 at the…

  9. Company document · Union Carbide documents · August 1980

    Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)

    Five 'Industrial Hygiene Monitoring for Asbestos' report forms addressed to R. F. Painter with copies to several others. They give personal air-sampling results for workers wetting, bagging and stripping insulation at Bldg. 777 on 8/18/80, 8/19/80…

  10. Company document · Union Carbide documents · December 5, 1978

    G. F. Hurley and M. E. Perry to Distribution on Clarification of Asbestos Insulation Removal and Monitoring Rules, South Charleston (1978)

    Memorandum clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It stated when the Industrial Hygiene Group would decide on personal asbestos monitoring during demolition,…

  11. Company document · Union Carbide documents · April 1, 1980

    Industrial Hygiene Monitoring for Asbestos: Air Samples for R. E. Raines and J. W. Greenlee Stripping Insulation, Bldg. 773, Report to W. T. Shelton (1980)

    Two Industrial Hygiene Monitoring for Asbestos forms dated 4/1/80, each recording personal air samples taken in Bldg. 773 while a worker stripped and bagged insulation from a 3-inch condensate line. Page 1 covers R. E. Raines and page 2 covers J. W.…

  12. Company document · Union Carbide documents · April 16, 1980

    Industrial Hygiene Monitoring for Asbestos: Stripping and Bagging Unibestos Pipe Insulation at South Charleston Plant, T. J. Kennedy, M. Smith and M. L. Finney (1980)

    Three industrial hygiene monitoring forms dated 4/16/80 report airborne asbestos fiber results for workers stripping and bagging about 200 feet of Unibestos pipe insulation on a pipe rack at the South Charleston Plant. Each form lists sample…

  13. Company document · Union Carbide documents · August 19, 1980

    Industrial Hygiene Monitoring for Asbestos, Reports to W. T. Shelton on Insulation Stripping at Bldg. 706 (1980)

    Two industrial hygiene monitoring forms dated 8/19/80, each reporting one personal air sample for asbestos taken at Bldg. 706, West End, second and third level, during stripping and bagging of insulation on the G-101 autoclave and adjacent lines.…