20 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · January 9, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, on Asbestos Insulation Removal at Texas City Marine Terminal (1987)
Letter notifying the Texas Air Control Board, under 40 CFR 61.146, of planned renovation to remove insulation from steam service headers at the Texas City marine terminal. It gives the amount (about 584 feet), the scheduled dates (January 22 to…
-
Company document · Union Carbide documents · August 14, 1985
J. B. Leverton to Texas Air Control Board on Asbestos Insulation Removal from Fluid Bed Dryer at Texas City Plant (1985)
Letter to the Texas Air Control Board giving notice, under 40 CFR 61.146, of planned removal of about 400 square feet of insulation from the fluid bed dryer at Bldg. 121 of the Texas City plant. It gives the schedule (after August 26, 1985, to be…
-
Company document · Union Carbide documents · July 22, 1980
A. P. Yalcinkaya to L. A. Smith and D. B. Whittington Posting OSHA Notice of Trial, Docket 80-1943, Texas City Ethanol Unit (1980)
…July 22, 1980, asking that the Notice of Trial be posted at the Ethanol Unit OSHRC Notice of Trial, Secretary of Labor v. Union Carbide Corporation, Docket 80-1943, signed by Judge Erwin L. Stuller, dated…
-
Company document · Union Carbide documents · July 23, 1985
J. B. Leverton to Texas Air Control Board on Renovation Notification for Asbestos Insulation Removal at Texas City Plant (1985)
…under 40 CFR 61.146, of Union Carbide's plan to remove about 1800 square feet of asbestos insulation from steam lines and valves in Building 180 at its Texas City plant. Removal was scheduled from…
-
Company document · Union Carbide documents · November 9, 1979
J. B. Leverton to F. S. Provenzano Transmitting the Texas City Plant Asbestos Standard Compliance Audit (1979)
Cover letter dated November 9, 1979 from J. B. Leverton to F. S. Provenzano, with copies to plant and corporate staff, attaching an audit of Texas City Plant compliance with the OSHA asbestos standard (29 CFR 1910.1001). Leverton concurred with the…
-
Company document · Union Carbide documents · January 12, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, Renovation Notification for Asbestos Insulation Removal at Texas City (1987)
…Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from the 1st and 2nd effect columns at building 94 of its Texas City plant. It gave about 238 square feet, a…
-
Company document · Union Carbide documents · February 26, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, Notifying of Asbestos Steam Line Insulation Removal at Texas City Plant (1987)
…under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from 520 linear feet of 3-inch steam line north of building 56 at the Texas City plant, from March 23 to June…
-
Company document · Union Carbide documents · December 12, 1985
J. B. Leverton to Bill Stewart, Texas Air Control Board, on Asbestos Insulation Removal Notification at Texas City Plant (1985)
Two letters from J. B. Leverton of Union Carbide's Texas City Industrial Hygiene department to the Texas Air Control Board under 40 CFR 61.146. The December 5, 1985 letter gave notice of planned removal…
-
Company document · Union Carbide documents · September 30, 1985
J. B. Leverton to Texas Air Control Board on Asbestos Ceiling Tile Removal at the Texas City Plant (1985)
…40 CFR 61.146, that Union Carbide planned to remove about 700 square feet of 18-year-old ceiling tile from Building 89 at its Texas City plant between late October 1985 and October 31, 1985…
-
Company document · Union Carbide documents · March 14, 1986
J. B. Leverton to Bill Stewart, Texas Air Control Board, Notifying of Asbestos Insulation Removal at Texas City Plant, with Attached Renovation Notice Form (1986)
…the Texas Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos-containing insulation from conduit at Bldg. 57 of its Texas City plant between April 1 and April 11, 1986…
-
Company document · Union Carbide documents · April 8, 1986
J. B. Leverton to Texas Air Control Board (Bill Stewart) on Asbestos Insulation Removal Notification, Texas City Plant (1986)
Letter notifying the Texas Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from equipment in its plant at 3301 5th Avenue South, Texas City, Texas. It states that…
-
Company document · Union Carbide documents · July 12, 1977
J. B. Leverton to J. D. Martin on Industrial Hygiene Monitoring of Contract Personnel to Meet OSHA Standards (1977)
Internal correspondence from J. B. Leverton to J. D. Martin requesting that drafts of asbestos and benzene procedures for construction at Texas City be sent to the HEA Business Team for comment and approval, and guidance on consistency with…
-
Company document · Union Carbide documents · August 27, 1980
J. B. Leverton to D. H. Glenn, R. E. Kirkland and A. P. Yalcinkaya on Preparation Meetings for the OSHA Trial in Houston (1980)
Internal Union Carbide memo from Texas City asking three recipients to attend preparation meetings on September 17 and 18, 1980, in J. B. Leverton's office ahead of an OSHA trial in Houston on September 23…
-
Company document · Union Carbide documents · February 24, 1987
J. B. Leverton to Eli Bell, Texas Air Control Board, Giving Notice of Asbestos Insulation Removal at Texas City Olefins Unit (1987)
Letter to the Texas Air Control Board giving notice, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from 400 linear feet of equipment at building #238, No. 3 Olefins, Texas City…
-
Company document · Union Carbide documents · March 14, 1979
J. B. Leverton to J. H. Barrett et al. on OSHA Investigation at the Texas City Plant (1979)
Internal Union Carbide memo reporting an OSHA industrial hygienist's March 14, 1979 visit to the Texas City plant to investigate an employee complaint about mercury catalyst and vinyl chloride exposure. It states that his sampling…
-
Company document · Union Carbide documents · April 8, 1986
J. B. Leverton to Eli Bell, Texas Air Control Board, on Asbestos Insulation Removal at the Texas City Plant (1986)
Letter from Union Carbide's Texas City Industrial Hygiene group notifying the Texas Air Control Board, under 40 CFR 61.146, of planned removal of asbestos-containing insulation from a steam line and two ethanol columns…
-
Company document · Union Carbide documents · January 8, 1979
J. B. Leverton to H. R. Schulz on OSHA Complaint About Restrooms in Bldg. 239, Texas City Plant (1979)
…the Leverton memo of Jan. 8, 1979 (UCTC 20886) Letter from R. Davis Layne, Area Director, OSHA Houston South Area Office, to Union Carbide Corp., Texas City, Jan. 2, 1979, on Complaint #267 (UCTC 20887-20888)
-
Company document · Union Carbide documents · June 22, 1979
J. B. Leverton to D. L. Engle and Others on OSHA Investigation at the Texas City Plant (1979)
Internal Union Carbide memo reporting that an OSHA industrial hygienist, Richard Miller, came to the Texas City plant on June 21, 1979 to sample employee exposure to ethylene oxide during a filter change at building 19…
-
Company document · Union Carbide documents · June 5, 1986
J. B. Leverton to Texas Air Control Board on Asbestos Insulation Removal at Texas City Plant (1986)
…under 40 CFR 61.146, that Union Carbide planned to remove about 238 square feet of insulation from the 1st and 2nd effect columns at Building 94 of its Texas City plant. It gave a June…
-
Company document · Union Carbide documents · September 18, 1980
J. B. Leverton to R. Davis Layne (OSHA) Acknowledging a Complaint About Cigarette Smoke at a Conference (1980)
Letter from J. B. Leverton of Union Carbide's Chemicals and Plastics unit in Texas City to the OSHA Houston South Area Director. It acknowledges OSHA's September 8, 1980 letter about a complaint and says…