No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

13 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · June 15, 1971

    P. W. McDaniel and J. L. Myers Report of Call on EPA Office of Air Programs Regarding Calidria Pellets and Asbestos Emission Standards (1971)

    Report of a June 1971 meeting between Union Carbide staff and EPA Office of Air Programs personnel (Source Control Branch) to discuss how Calidria pellets and the production system reduce asbestos dust. It records EPA's…

  2. Company document · Union Carbide documents · July 9, 1976

    John L. Myers to W. C. Thurber on Packaging and Transportation Problems with Asbestos Dust (1976)

    Internal memo from John L. Myers of the Calidria Asbestos department to W. C. Thurber, with copies to several others, about customer complaints on dusty asbestos packaging and shipping. Myers recommended shrink-wrapping all bagged products, bag…

  3. Company document · Union Carbide documents · May 23, 1975

    J. L. Myers to F. H. Larrison on June Calidria Sales Estimates, with G. L. Dickson to R. E. Byrne on SG-210 and HPO Projected June Sales (1975)

    Two internal Union Carbide memos, both dated May 23, 1975, on expected June 1975 Calidria asbestos orders. Myers' memo to Larrison lists customer orders by grade (SG-101 to SG-104, SX-24, CSV) and the…

  4. Company document · Union Carbide documents · April 10, 1974

    John L. Myers to F. H. Larrison and G. L. Vessels on Reducing April Production Requirements (1974)

    Telex (TWX) dated April 10, 1974 from John L. Myers in Niagara Falls to the King City, California plant, with a copy to W. C. Thurber. It lowers the April production requirements for five products (SG-104, HPP-EXP, VISBESTOS, IMCOBEST, CSV), reports…

  5. Company document · Union Carbide documents · July 31, 1973

    John L. Myers to R. E. Byrne, G. L. Dickson, B. L. Ingalls, T. P. Norris, H. B. Rhodes and J. E. Walsh on Test Pallets of SG-210 and Tuck-In Sleeve (1973)

    Internal memo from the Calidria Asbestos marketing department reporting that King City prepared 18 test pallets of SG-210 with tuck-in sleeves to see whether the sleeves reduce leakage of asbestos from bag fill spouts. It listed the customer…

  6. Company document · Union Carbide documents · June 1, 1976

    John L. Myers to W. C. Thurber Transmitting the Calidria Asbestos 5-Year Sales Forecast (1976)

    Internal Metals Division memo from John L. Myers to W. C. Thurber enclosing a 5-year forecast for Calidria asbestos, with back-up sheets for higher-volume products and export sales. The memo lists RG-600 sales estimates for 1977-1981 separately and…

  7. Company document · Union Carbide documents · May 6, 1976

    John L. Myers to W. C. Thurber on April 1976 Calidria Sales Compared with Forecast II (1976)

    Internal memo from John L. Myers to W. C. Thurber comparing unofficial April 1976 Calidria sales with first-quarter actuals and 2Q Forecast II monthly averages. It reports export sales above forecast and domestic sales below, discusses shortfalls at…

  8. Company document · Union Carbide documents · November 4, 1974

    W. C. Thurber to O. J. Malocarne et al. on Bag Spout Leakage and Shrink Wrapping, with Earlier J. L. Myers Memo to Thurber on Packaging (1974)

    Exhibit of two pages. Page 1 is a November 4, 1974 letter from W. C. Thurber to O. J. Malocarne and four others stating that leakage from the bag fill valve was a major packaging problem and requesting a bag shrink film oven and a bag cleaning…

  9. Company document · Union Carbide documents

    John L. Myers Memo on Calidria Asbestos Financial Performance, with Asbestos SPU Financial Tables and Notes (1970-1980)

    Six pages of financial material on Union Carbide's asbestos business, marked Plaintiff's Exhibit UC-1340. It holds two handwritten summaries of asbestos and Calidria sales, income and return figures (dated 3/4/76 and…

  10. Company document · Union Carbide documents · June 15, 1971

    P. W. McDaniel and J. L. Myers Report of Call on EPA Source Control Branch about Calidria Pellets and Asbestos Emission Standards (1971)

    …and the King City production system reduce asbestos dust, the EPA's work on emission standards for non-occupational exposure, and recommended follow-up actions for Union Carbide staff, including tests on cancer and mesothelioma development.

  11. Company document · Union Carbide documents

    Calidria Asbestos SG-210 Tape-Joint Compound Literature, with H. B. Rhodes SG-130 Specifications Memo (1971), D. H. Reed Technical Service Report (1971) and J. L. Myers Daubert Memo (1978)

    Brochure: Calidria Asbestos SG-210 for tape-joint compounds, with a T-135 acoustical and texturing compound panel and a Union Carbide address block Data sheets: performance data in ready-mix formulations, and typical physical properties…

  12. Company document · Union Carbide documents · June 18, 1976

    John L. Myers to R. E. Byrne, Jr. on Calidria Inventory, Sales and Production, with Sales/Inventory Summary Sheets (1976)

    Internal Union Carbide Metals Division memo from the Calidria Asbestos department reporting on inventory relative to sales and production for 1975 and 1976. It discusses RG-244 and RG-600 sales, reduced Montello drilling mud purchases…

  13. Company document · Union Carbide documents · June 14, 1973

    John L. Myers to Dan Miller (Kentile Floors) on Limiting SG-102 Asbestos Shipments, with Calidria Sales Forecast Sheets (1973)

    A June 14, 1973 letter from John L. Myers to Kentile Floors said shipments of pelletized asbestos product SG-102 had to be limited for July through September because of increased demand. It is followed by three handwritten or typed sales sheets: a…