2 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · June 21, 1979
L. R. Noble Memo to D. E. Raines on Safety Inspection of the Insulation Fabrication Shop, Building 2018, with Handwritten Follow-up Notes (1979)
…Randy Noble, responding to inspection items #2, #3 and #4 (Industrial Hygiene dust evaluation, replacing the protective pole, 15 mg/m3 nuisance dust limit and respirator use) Typed Union Carbide memo, June 21, 1979, L. R…
-
Company document · Union Carbide documents · January 25, 1979
L. R. Noble to All Craft Superintendents on Insulation Application, Fabrication, Removal and Disposal Procedure VIII-22 (1979)
Memorandum from L. R. Noble to the craft superintendents about Construction Department Procedure VIII-22 on insulation application, fabrication, removal and disposal. It states that he reviewed the procedure with insulation and labor craft…