90 results for “Union Carbide Corporation”, page 3 of 5
-
Company document · Union Carbide documents · April 13, 1987
R. D. Ondocsin to Distribution List on the April 22, 1987 Asbestos Standard Review Meeting, with M. A. Patel's Draft R/D Asbestos Procedure (1987)
A April 13, 1987 memo from Robert D. Ondocsin announced an April 22, 1987 working session in Danbury to review the OSHA construction asbestos standard, with an agenda and distribution lists. Also included is an April 30, 1987 Technical Center memo…
-
Company document · Union Carbide documents · May 21, 1987
M. A. Patel to B. R. McMakin and R. W. Scoular transmitting Draft Asbestos Containing Material Removal and Handling Procedure (1987)
Internal Union Carbide Technical Center memo from Manhar A. Patel transmitting a draft procedure for removal and handling of asbestos-containing material and asking recipients to review it and adopt it in their department safety and…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at Sistersville Plant (1984)
Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos exposure monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. The memo states that Building 48…
-
Company document · Union Carbide documents · July 20, 1987
V. E. Stover and M. A. Patel to R. W. Scoular on Background Asbestos Monitoring in Technical Center Buildings (1987)
Internal correspondence transmitting results of background asbestos air monitoring done in various Technical Center buildings in 1987. The memo states the OSHA 0.1 fiber/cc Action Level and a 'generally accepted' background level of 0.01 fiber/cc,…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · January 21, 1987
Manhar A. Patel to B. H. Avashia, M.D., and Others on Asbestos Respiratory and Medical Surveillance Requirements, with OSHA Standard Excerpts (1987)
A two-page Union Carbide internal memo of January 21, 1987, from Manhar A. Patel to medical, safety and engineering staff, forwarding the respirator and medical surveillance requirements of the OSHA asbestos standard for asbestos abatement…
-
Company document · Union Carbide documents · October 7, 1986
A. F. Terry to T. L. Collins and Others on Asbestos Exposure Monitoring of Steam Line Stripping, Building 726 (1986)
Internal Union Carbide memo transmitting asbestos air-monitoring results for two employees, R. P. Hess and F. R. Creech, who stripped asbestos insulation from steam lines outside and inside the Building 726 compressor room on September…
-
Company document · Union Carbide documents · April 6, 1987
Manhar A. Patel to R. E. Sergent on Asbestos Training for Services Department Personnel (1987)
Internal memo from an industrial hygienist transmitting slides used to train Services Department employees who are not routinely involved in asbestos abatement but may be exposed to asbestos in their work. The memo states that HEPA respirators are…
-
Company document · Union Carbide documents · October 23, 1981
Manhar A. Patel to W. L. Browning and J. W. Perry, Jr. on Correction to Asbestos Monitoring in Gasket Shop, 512 Construction (1981)
A one-page internal memo stating that the writer's October 20, 1981 letter on asbestos monitoring in the Gasket Shop (512 Construction) contained an error caused by misinterpreting data from the 512 Industrial Hygiene group. It asks recipients to…
-
Company document · Union Carbide documents · April 26, 1982
Mark E. Bell to R. F. Painter: Industrial Hygiene Monitoring for Asbestos, D. C. Shamblin, Building 706 (1982)
Union Carbide 'Industrial Hygiene Monitoring for Asbestos' form, Computer Ref. W-1315, reporting air sampling of D. C. Shamblin in Building 706 on 4/21/82. It lists a personal sample of 1.2 fibers >5…
-
Company document · Union Carbide documents · November 13, 1987
M. A. Patel to P. L. Graham et al. on Respiratory Protection for Asbestos, with 1984 R. G. Hanlon Memo and DuPont Respirator Study Figures (1987)
A November 13, 1987 internal memo from Manhar A. Patel forwarded a DuPont study of respirator performance against asbestos fibers and continued to recommend 3M respirators. Attached were a November 6, 1984 Richard G. Hanlon memo on the same subject,…
-
Company document · Union Carbide documents · November 11, 1986
Manhar A. Patel to A. J. Bonham on Asbestos in the Glass Blowing Shop Oven (1986)
Internal Union Carbide memo reporting that a sample of tray-lining material from the oven in the glass blowing shop was analyzed and showed possible chrysotile asbestos. It states the material was crumbling and recommends careful…
-
Company document · Union Carbide documents · July 17, 1981
Industrial Hygiene Monitoring for Asbestos: Insulation Stripping Samples for Chandler, Coleman, Agosti and Templeton, Sent to R. F. Painter (1981)
Four Union Carbide industrial hygiene monitoring forms (Computer Ref. W-1198), dated July 17, 1981, report asbestos fiber concentrations for four workers sampled on 07/10/81 while stripping and bagging steam-line insulation near Bldg…
-
Company document · Union Carbide documents · April 16, 1986
V. E. Stover to C. K. Campbell on Asbestos Testing of Pipe Insulation Near the Sandblasting Shop, Institute Plant (1986)
Internal correspondence reporting that, at C. K. Campbell's request, insulation samples were collected from three pipelines near the Construction sandblasting shop at the Institute plant, where the insulation was reported to be crumbling. Two of the…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to D. E. Raines on Dust and Chemicals Exposure Monitoring in the Insulation Shop, Building 2018 (1984)
Memorandum reporting a March-April 1984 Technical Center industrial hygiene survey of dust and chemical exposures in the Insulation Shop, Building 2018. It states that dust, benzene-soluble particulate, and chemical results were generally below…
-
Company document · Union Carbide documents · July 15, 1987
V. E. Stover and M. A. Patel to C. W. Wible on Asbestos Exposure Monitoring of Workers Pulling Cable in Building 770 (1987)
Internal Union Carbide memo transmitting results of non-abatement asbestos exposure monitoring on two employees, J. A. Ingram and W. S. Ballingall, who pulled computer cable above ceiling tile and through service shafts in Building 770…
-
Company document · Union Carbide documents · July 22, 1986
M. A. Patel to Distribution List on the Amended OSHA Asbestos Standard, with T. E. Hanning's Summary of Changes (1986)
A July 22, 1986 internal memo from Technical Center industrial hygienist Manhar A. Patel reported that OSHA had amended its asbestos standard and attached T. E. Hanning's summary of the changes. The summary covers the lower exposure limit,…
-
Company document · Union Carbide documents · November 18, 1983
Industrial Hygiene Monitoring for Asbestos: J. W. Greenlee Stripping Steam Line Insulation, 770 Fan Room, to W. T. Shelton (1983)
Industrial hygiene monitoring report for asbestos dated Nov. 18, 1983, covering one personal and three area air samples taken on 11/8/83 while J. W. Greenlee stripped insulation from a steam line in the 770 Fan Room. It lists fiber concentrations,…
-
Company document · Union Carbide documents · November 22, 1983
Manhar A. Patel to D. R. Paugh Transmitting the 1984 Industrial Hygiene Program for the 511 Construction Department (1983)
Internal Union Carbide correspondence from Manhar A. Patel transmitting a 1984 industrial hygiene program for the 511 Construction Department. The attached program lists planned exposure monitoring by shop and frequency, including dust in the insulation shop…
-
Company document · Union Carbide documents · October 23, 1981
M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)
Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…