8 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · December 1, 1986
M. A. Patel to T. E. Hanning Transmitting Notes on Union Carbide Practice SH-256, Removal and Handling of Asbestos-Containing Insulation, with Hanning's Asbestos Update Memo (1986)
Handwritten note dated 12-1-86 to T. E. Hanning with comments on SH-256 (UCC 011229) Union Carbide Central Engineering Recommended Practice SH-256, Removal and Handling Asbestos-Containing Insulation Material, September 1986, 6 pages…
-
Company document · Union Carbide documents · 1986
West Virginia Air Pollution Control Commission Asbestos Notice Letter to R. H. Smith, with Union Carbide Technical Center Asbestos Sampling and Monitoring Memos (1986)
…Commission) to R. H. Smith, Union Carbide, on notice requirements for asbestos demolition and renovation under 40 CFR Part 61 Subpart M Blank WVAPCC Asbestos Removal Notification form (APCC-ARN-3/86) Memo, June 23, 1986…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at the Sistersville Plant (1984)
Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos air monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping by Construction Department employees on April 2 and 25, 1984.…
-
Company document · Union Carbide documents · April 13, 1987
R. D. Ondocsin to Distribution List on the April 22, 1987 Asbestos Standard Review Meeting, with M. A. Patel's Draft R/D Asbestos Procedure (1987)
A April 13, 1987 memo from Robert D. Ondocsin announced an April 22, 1987 working session in Danbury to review the OSHA construction asbestos standard, with an agenda and distribution lists. Also included is an April 30, 1987 Technical Center memo…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring at Sistersville Plant (1984)
Memorandum from M. A. Patel to J. W. Karn transmitting results of asbestos exposure monitoring at the Sistersville Plant (Steam Plant and Polymer 2, Building 48) during insulation stripping on April 2 and 25, 1984. The memo states that Building 48…
-
Company document · Union Carbide documents · June 20, 1984
M. A. Patel to D. E. Raines on Dust and Chemicals Exposure Monitoring in the Insulation Shop, Building 2018 (1984)
Memorandum reporting a March-April 1984 Technical Center industrial hygiene survey of dust and chemical exposures in the Insulation Shop, Building 2018. It states that dust, benzene-soluble particulate, and chemical results were generally below…
-
Company document · Union Carbide documents · January 19, 1984
M. A. Patel to M. L. Mills on Identification of an Unknown Material at the Institute Plant, with L. D'Esposito's IR Spectrum Memo (1984)
Internal Union Carbide correspondence from January 1984 about a white powdery material found oozing from the floor of the field toilet in the construction shop area at the Institute plant. An R/D memo reported an…
-
Company document · Union Carbide documents · February 1, 1984
M. A. Patel to J. W. Karn on Asbestos Monitoring of Construction Employees at the Sistersville Plant (1984)
Memo reporting personal exposure monitoring for asbestos on January 12, 1984, while Construction Department employees stripped asbestos-containing pipe insulation at the Sistersville Plant steam plant. It states all monitored results were below the…