No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

4 results for “Union Carbide Corporation”

  1. Company document · Union Carbide documents · May 3, 1985

    M. F. Stowers and Manhar A. Patel to W. T. Shelton: Industrial Hygiene Monitoring for Asbestos, Bldg. 707 Heliflo Insulation Stripping (1985)

    Industrial hygiene monitoring report dated May 3, 1985 on personal air samples taken April 26, 1985 from two workers stripping old insulation from a heliflo system in Bldg. 707. Results were 0.38 and 0.27 fibers/cc over 35 minutes, compared against…

  2. Company document · Union Carbide documents · April 17, 1985

    M. F. Stowers to G. W. Phares on Asbestos Monitoring at the Institute Plant SEVIN Unit (1985)

    Internal memo reporting asbestos exposure monitoring done April 16, 1985 while two construction insulators stripped about 20 feet of old insulation from a six inch steam line at the SEVIN unit at the Institute plant. It states both samples were well…

  3. Company document · Union Carbide documents · April 17, 1985

    M. F. Stowers to G. W. Phares on Asbestos Exposure Monitoring During Steam Line Insulation Stripping at the Institute Plant (1985)

    …April 17, 1985, on asbestos monitoring at the Institute plant Union Carbide notice that the document relates to asbestos litigation and should not be destroyed (Audit Report No. and File No. handwritten) Attached personal exposure monitoring…

  4. Company document · Union Carbide documents · April 12, 1985

    G. W. Phares to B. H. Avashia and Others on Asbestos Monitoring at the Institute Plant SEVIN Unit (1985)

    Internal Union Carbide memo reporting asbestos exposure monitoring on April 9, 1985, when two construction insulators stripped about 20 ft. of old insulation from a 6 inch steam line at the SEVIN unit at the Institute…