2 results for “Ford Motor Company”
-
Company document · Union Carbide documents · April 22, 1981
Industrial Hygiene Monitoring for Asbestos: Insulator Pipe Stripping at Bldg. 773 Tank Pad, J. F. Chandler and D. C. Shamblin, to R. F. Painter (1981)
Monitoring report for J. F. Chandler, 04/20/81, two samples (78 and 125 minutes), TWA 5 µm/cm3 Monitoring report for D. C. Shamblin, 04/20/81, two samples (85 and 123 minutes), TWA .1…
-
Company document · Union Carbide documents · April 22, 1981
Industrial Hygiene Monitoring for Asbestos: Insulator Stripping Pipe Insulation at Bldg. 773, Reports to R. F. Painter (1981)
Monitoring report for D. C. Shamblin, 04/20/81, samples of .1 and .2 fibers >5 µm/cm3, TWA .1 (UCC 024742) Monitoring report for J. F. Chandler, 04/20/81, both samples 5 µm/cm3…