Industrial Hygiene Monitoring for Asbestos: Insulation Stripping and Bagging Samples, Bldg. 774, Report to R. F. Painter (1981)
Four Union Carbide industrial hygiene monitoring forms (Computer Ref. W-1198), dated July 17, 1981, reporting airborne asbestos fiber results for four workers sampled on 07/10/81 while stripping and bagging insulation from a steam…
-
Company document · Union Carbide documents · April 22, 1981
Industrial Hygiene Monitoring for Asbestos: Insulator Pipe Stripping at Bldg. 773 Tank Pad, J. F. Chandler and D. C. Shamblin, to R. F. Painter (1981)
Two Union Carbide industrial hygiene monitoring forms for asbestos, dated 04/22/81, reporting air sampling on 04/20/81 of two insulators stripping about 100 feet of 1-1/2" pipe insulation outside Bldg. 773…
-
Company document · Union Carbide documents · April 22, 1981
Industrial Hygiene Monitoring for Asbestos: Insulator Stripping Pipe Insulation at Bldg. 773, Reports to R. F. Painter (1981)
Two industrial hygiene monitoring forms dated 04/22/81 reporting airborne asbestos fiber sampling on 04/20/81 for two insulators stripping about 100 feet of 1-1/2" pipe insulation outside Bldg. 773. The first form reports D. C. Shamblin's results…
-
Company document · Union Carbide documents · July 30, 1981
Industrial Hygiene Monitoring Reports for Asbestos Insulation Stripping, Bldg. 770-137, to W. T. Shelton (1981)
Two Union Carbide industrial hygiene monitoring forms for asbestos, dated July 30, 1981, reporting personal air sampling on two workers in Bldg. 770-137 on 07/24/81. One sample measured .3 fibers >5 µm/cm3…
-
Company document · Union Carbide documents · July 30, 1981
Industrial Hygiene Monitoring for Asbestos: Insulator Stripping and Bagging Samples for J. W. Greenlee and J. R. Monin, Bldg. 770-137 (1981)
Two industrial hygiene monitoring reports for asbestos, dated July 30, 1981, each reporting a single air sample taken on 07/24/81 in Bldg. 770-137. One covers J. W. Greenlee stripping about 60 feet of insulation from a steamline (.3 fibers >5…
-
Company document · Union Carbide documents · July 17, 1981
Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)
Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…
-
Company document · Union Carbide documents · July 17, 1981
Industrial Hygiene Monitoring for Asbestos: Insulation Stripping Samples for Chandler, Coleman, Agosti and Templeton, Sent to R. F. Painter (1981)
Four Union Carbide industrial hygiene monitoring forms (Computer Ref. W-1198), dated July 17, 1981, report asbestos fiber concentrations for four workers sampled on 07/10/81 while stripping and bagging steam-line insulation near Bldg…
-
Company document · Union Carbide documents · October 20, 1980
Industrial Hygiene Monitoring for Asbestos: Results for J. E. Hackney and R. P. Hess Stripping Dowtherm System Insulation, sent to W. T. Shelton (1980)
Two industrial hygiene monitoring forms for asbestos dated 10/20/80, addressed to W. T. Shelton of the 704 Shop. Each reports a one-sample fiber result for a worker (J. E. Hackney, 3.04 fibers over 57 minutes; R. P. Hess, 1.3 fibers over 60 minutes)…