32 results for “Union Carbide Corporation”, page 1 of 2
-
Company document · Union Carbide documents · 1981
Breathing Air Inspection and Audit and Sanitation Inspection Forms for Reaction #2 (1981)
Four pages of completed plant inspection forms for the Reaction #2 area: a two-page Breathing Air Inspection and Audit checklist and a two-page Sanitation Inspection checklist. On the breathing air form every item is checked "Yes" and the comments…
-
Company document · Union Carbide documents · January 1983
Mario Gutierrez Safety Audit Forms for Maintenance (Hearing Conservation, Hearing Protection, Noise) and Stores (Detector Tubes) (1983)
Set of completed safety audit forms dated January 1983. It includes a Share Audit Procedure form on Hearing Conservation for Maintenance, Hearing Protection and Noise inspection checklists for Maintenance, and a Detector Tubes expiration audit for…
-
Company document · Union Carbide documents · February 1, 1983
Share Audit Procedure and Chemical Inspection Audit Forms for Chlorothene Handling and Chemical System Inventory, Energy/Oxygen Department (1983)
Six pages of completed safety audit forms from 1983: a Share Audit Procedure sheet for the chlorothene handling procedure, a Chlorothene Handling Inspection and Audit checklist for Building 364, and Chemical System Inventory Inspection and Audit…
-
Company document · Union Carbide documents · October 2, 1980
M. Gutierrez to K. G. Townsend on Brownsville Plant Heat Stress Survey (1980)
Internal memo from M. Gutierrez to K. G. Townsend transmitting results of a heat stress survey taken the prior month at the Brownsville plant. It lists eight explanatory points for the ACGIH permissible heat exposure threshold limit values and…
-
Company document · Union Carbide documents · 1982
Radiation Protection Inspection and Audit of Maintenance Radiography, Signed by Mario Gutierrez (1982)
A one-page Radiation Protection Inspection and Audit checklist for the Maintenance unit, covering ionizing radiation (radiography). Every item under general requirements for radiography and radiographer requirements is checked "Yes", and the…
-
Company document · Union Carbide documents · March 2, 1983
Share Audit Procedure and Chlorothene Handling Inspection and Audit, Linde Department, by Mario Gutierrez (1983)
Two-page set of audit forms dated March 2, 1983, for the Linde department. The first is a Share Audit Procedure form on chlorothene handling, with one person interviewed and mostly yes answers. The second is a Chlorothene Handling Inspection and…
-
Company document · Union Carbide documents · 1981
Share Audit Procedure and Ventilation Inspection and Audit of Lab Hood, Building 522 Recovery Department (1981)
A Share Audit Procedure form for the Recovery Department's ventilation procedure, dated fourth quarter 1981, with a ventilation inspection and audit checklist for a lab hood in Building 522 Recovery. The audit form marked no deficiency and…
-
Company document · Union Carbide documents · January 18, 1983
Reaction Department Share Audit and Noise, Hearing Protection and Detector Tube Inspection Forms Completed by Mario Gutierrez (1983)
Set of January 1983 audit and inspection forms for the Reaction department. It includes a Share Audit Procedure sheet on hearing conservation and detector tubes, noise and hearing protection inspections for Reaction #1 and #2, and detector tube…
-
Company document · Union Carbide documents · March 8, 1983
Share Audit Procedure and Sanitation Inspection Checklists for Cafeteria and Vending Machines, Employee Relations (1983)
A Share Audit Procedure form for the Employee Relations department dated 3-8-83 covering the Sanitation procedure, followed by completed sanitation inspection checklists for cafeteria vending machines and the cafeteria food service establishment.…
-
Company document · Union Carbide documents · 1981
Share Audit Procedure and Ventilation Inspection and Audit of Lab Hood, Building 522 Recovery Department (4Q 1981)
A Share Audit Procedure form for the Recovery Department's ventilation procedure, dated 4Q 1981, followed by a Ventilation Inspection and Audit checklist for a lab hood in Building 522 Recovery. The form records no deficiency, says the procedure is…
-
Company document · Union Carbide documents · August 20, 1982
Plant Safety and Health Inspection Team to H. D. Unland on Safety and Health Inspection of the 529 Area, Brownsville Plant (1982)
Internal correspondence dated August 20, 1982 reporting the findings of the Brownsville Plant Safety and Health Inspection Team on the 529 area. It lists numbered observations by unit level and tank farm area, covering leaks, missing insulation,…
-
Company document · Union Carbide documents · November 18, 1981
M. Gutierrez to K. G. Townsend, OSHA Inspection Chronology, with Townsend Cover Memo to J. L. Wyatt (1981)
Internal Union Carbide memo chronicling an OSHA industrial hygiene inspection of the Brownsville, Texas, Coatings Materials plant from November 2 to November 17, 1981. It covers the compliance officer's plant walk-through, worker interviews, personal…
-
Company document · Union Carbide documents · April 10, 1981
K. G. Townsend to R. E. Theisen Transmitting Energy/Oxygen Hearing Protection and Noise Audit Results, Brownsville (1981)
A cover memo of April 10, 1981 from K. Gran Townsend to R. E. Theisen forwards the SHARE Department's hearing protection audit results for the Energy/Oxygen departments and asks that deficiencies be corrected. The attached forms, dated 4/6/81, are a…
-
Company document · Union Carbide documents · January 18, 1983
Mario Gutierrez Share Audit of Hearing Conservation Procedure and Noise and Hearing Protection Inspections, Linde Department (1983)
Four-page set of audit checklists for the Linde department. It has a Share Audit Procedure form on the Hearing Conservation procedure dated 1-18-83, with a deficiency marked as existing and a follow-up audit set for 3 months. It also has Noise and…
-
Company document · Union Carbide documents · December 18, 1981
Sanitation Inspection Checklists for the Cafeteria and Its Vending Machines (1981)
Filled-in sanitation inspection forms for the cafeteria, dated December 18, 1981. They include a vending machines checklist for candy, pastry, chips, coffee and sodas, with a handwritten comment on page 3, and a general sanitation checklist covering…
-
Company document · Union Carbide documents · January 1983
Share Audit and Hearing Protection, Noise and Detector Tube Inspection Forms for the Recovery Department, Prepared by Maria Gutierrez (1983)
Set of handwritten-on-form audit sheets for the Recovery department dated January 1983. It consists of a Share Audit Procedure form on hearing conservation and detector tubes (deficiency marked as existing), a Hearing Protection inspection with…
-
Company document · Union Carbide documents · August 29, 1980
Mario Gutierrez Heat Stress Inspection and Audit Forms for Recovery, Energy and Wacker Reaction Units (1980)
Three heat stress inspection and audit checklists, each dated 8/29/80 and completed by Mario Gutierrez, for the Recovery, Energy, and Wacker-Reaction-733 units. The forms record yes/no answers on documentation of heat stress locations, maintenance…
-
Company document · Union Carbide documents · 1981
SHARE Audit of Ventilation, Sanitation and Breathing Air Procedures, Reaction Department (4Q 1981)
A set of completed SHARE audit forms for the Reaction department, fourth quarter 1981, covering ventilation (lab hoods), breathing air and sanitation. The cover sheet records that no deficiency existed, 6 personnel were interviewed, and retraining…
-
Company document · Union Carbide documents · January 18, 1983
Share Audit Procedure and Detector Tubes Inspection and Audit, Distribution Department (1983)
A two-page safety audit of the Distribution department's detector tube procedure, dated 1-18-83. The first page is a Share Audit Procedure form marked 'Deficiency Exists', and the second is a detector tube inspection sheet listing expired boxes and…
-
Company document · Union Carbide documents · 1982
Asbestos Handling Inspection and Audit Checklist, Maintenance Unit, Inspected by Mario Gutierrez (1982)
A two-page form titled "Asbestos Handling Inspection and Audit" for the Maintenance unit, dated by hand as the first quarter of 1982. Every item in the work site, personnel, work practice and general requirements sections is checked "Yes," and the…