Company document · Union Carbide documents · October 2, 1979
Ruth Clise to W. T. Shelton on Asbestos Monitoring in the Building 720 Basement Equipment Area (1979)
Internal memo reporting breathing zone air samples taken on September 19, 1979 on two workers who stripped about 40 feet of suspected asbestos steamline insulation in the basement equipment area of Building 720. It reports exposures of 0.3 and 0.5…
-
Company document · Union Carbide documents · November 16, 1979
Ruth Clise to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse, South Charleston (1979)
Internal industrial hygiene report on a survey of October 26, 1979, measuring construction workers' exposure to asbestos fibers while insulation was stripped from an exhaust duct in the Building 704 Powerhouse. It reports that the dust was too heavy…
-
Company document · Union Carbide documents · October 29, 1979
Ruth Clise to W. T. Shelton on Asbestos Monitoring of Insulation Stripping, Building 704 Third Level, South Charleston (1979)
Internal memo reporting breathing-zone asbestos fiber samples taken on two insulators, N. J. Dean and R. E. Raines, while they stripped suspected asbestos insulation from a steam line on the third level of Building 704. It gives the sample results…
-
Company document · Union Carbide documents · October 29, 1979
Ruth Clise to W. T. Shelton on Asbestos Monitoring of Insulation Stripping in Building 704, South Charleston (1979)
Internal correspondence reporting breathing zone air sampling of two insulators, N. J. Dean and R. E. Raines, who stripped suspected asbestos insulation from a steam line on the third level of Building 704 in South Charleston, West Virginia. The…
-
Company document · Union Carbide documents · November 16, 1979
Technical Center IH/EP to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse, South Charleston (1979)
Internal report on air sampling for asbestos fibers on October 26, 1979, while construction workers stripped and bagged insulation from an exhaust duct in Building 704 Powerhouse. It states that dust on the workers' breathing zone samples was too…