No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

31 results for “Union Carbide Corporation”, page 1 of 2

  1. Company document · Union Carbide documents · August 25, 1980

    Industrial Hygiene Monitoring for Asbestos: Insulation Stripping and Bagging at Bldg. 777, Addressed to R. F. Painter (1980)

    Three Industrial Hygiene Monitoring for Asbestos forms (Computer Ref. W-1078) reporting air samples taken 8/25/80 at Bldg. 777, between the eastern side of the ACR unit and the dewatering shed, during insulation stripping and bagging. Each form…

  2. Company document · Union Carbide documents · August 1980

    Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777, to R. F. Painter (1980)

    Five 'Industrial Hygiene Monitoring for Asbestos' report forms covering workers wetting, bagging and stripping insulation in Bldg. 777. On 8/18/80 and 8/19/80, R. E. Templeton's samples gave time-weighted averages of 2.8 and 2.5 fibers >5 µm/cm3,…

  3. Company document · Union Carbide documents · April 28, 1980

    Industrial Hygiene Monitoring for Asbestos at #1 Powerhouse, Institute: Insulation Stripping and Bagging Results for Jividen, Cobb and Grant (1980)

    Three industrial hygiene monitoring forms dated 4/28/80 report airborne asbestos fiber sampling at the #1 Powerhouse at Institute while insulation was stripped from steam lines on the #1 boiler and bagged for disposal. Sample results are given for…

  4. Company document · Union Carbide documents · August 1980

    Industrial Hygiene Monitoring for Asbestos: D. C. Shamblin Stripping Insulation, Bldg. 777, Reports to R. F. Painter (August 1980)

    Two Industrial Hygiene Monitoring for Asbestos forms covering personal air sampling of D. C. Shamblin while stripping insulation in Bldg. 777, Room 111, on 8/18/80 and 8/19/80. The forms list fiber concentrations, time-weighted averages compared…

  5. Company document · Union Carbide documents · July 17, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulation Stripping and Bagging Samples, Bldg. 774, Report to R. F. Painter (1981)

    Four Union Carbide industrial hygiene monitoring forms (Computer Ref. W-1198), dated July 17, 1981, reporting airborne asbestos fiber results for four workers sampled on 07/10/81 while stripping and bagging insulation from a steam…

  6. Company document · Union Carbide documents · August 5, 1980

    Industrial Hygiene Monitoring for Asbestos: Air Samples for J. W. Greenlee and R. E. Raines, Building 707 (1980)

    Two Industrial Hygiene Monitoring for Asbestos forms dated 8/5/80, each reporting one air sample taken in Bldg. 707, Fourth Level, Cell 11, during stripping and bagging of suspected asbestos-containing insulation from about 50 feet of steam line.…

  7. Company document · Union Carbide documents · April 22, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulator Pipe Stripping at Bldg. 773 Tank Pad, J. F. Chandler and D. C. Shamblin, to R. F. Painter (1981)

    Two Union Carbide industrial hygiene monitoring forms for asbestos, dated 04/22/81, reporting air sampling on 04/20/81 of two insulators stripping about 100 feet of 1-1/2" pipe insulation outside Bldg. 773…

  8. Company document · Union Carbide documents · August 19, 1980

    Industrial Hygiene Monitoring for Asbestos Reports to W. T. Shelton on Insulation Stripping in Bldg. 706 (1980)

    Two industrial hygiene monitoring forms for asbestos dated 8/19/80, each reporting one air sample taken in Bldg. 706 (West End, second and third level) while a worker stripped and bagged insulation on the G-101 autoclave and adjacent lines. The…

  9. Company document · Union Carbide documents · April 22, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulator Stripping Pipe Insulation at Bldg. 773, Reports to R. F. Painter (1981)

    Two industrial hygiene monitoring forms dated 04/22/81 reporting airborne asbestos fiber sampling on 04/20/81 for two insulators stripping about 100 feet of 1-1/2" pipe insulation outside Bldg. 773. The first form reports D. C. Shamblin's results…

  10. Company document · Union Carbide documents · July 30, 1981

    Industrial Hygiene Monitoring Reports for Asbestos Insulation Stripping, Bldg. 770-137, to W. T. Shelton (1981)

    Two Union Carbide industrial hygiene monitoring forms for asbestos, dated July 30, 1981, reporting personal air sampling on two workers in Bldg. 770-137 on 07/24/81. One sample measured .3 fibers >5 µm/cm3…

  11. Company document · Union Carbide documents · November 16, 1979

    Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)

    Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…

  12. Company document · Union Carbide documents · July 30, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulator Stripping and Bagging Samples for J. W. Greenlee and J. R. Monin, Bldg. 770-137 (1981)

    Two industrial hygiene monitoring reports for asbestos, dated July 30, 1981, each reporting a single air sample taken on 07/24/81 in Bldg. 770-137. One covers J. W. Greenlee stripping about 60 feet of insulation from a steamline (.3 fibers >5…

  13. Company document · Union Carbide documents · July 3, 1980

    Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)

    Three industrial hygiene monitoring forms for asbestos, each dated 7/3/80, reporting air samples taken in the basement of Bldg. 789 (cooling tower) while insulation was stripped and bagged. A.M. sample results were .3 (C. Miller), .7 (D. C.…

  14. Company document · Union Carbide documents · October 2, 1979

    Ruth Clise to W. T. Shelton on Asbestos Monitoring of Insulation Stripping in Building 720, South Charleston (1979)

    Internal memo reporting breathing zone air sampling taken September 19, 1979 on two workers, J. R. Monin and J. W. Greenlee, while they stripped about 40 feet of suspected asbestos steamline insulation in the basement of Building 720. It reported…

  15. Company document · Union Carbide documents · July 3, 1980

    Industrial Hygiene Monitoring for Asbestos: Cooling Tower Insulation Stripping, Building 789, to R. F. Painter (1980)

    Three industrial hygiene monitoring forms dated 7/3/80 report airborne fiber results for workers stripping and bagging insulation in the basement of Building 789 (cooling tower). The A.M. samples were .7, .3 and .3 fibers >5 µm/cm3; the P.M. samples…

  16. Company document · Union Carbide documents · July 17, 1981

    Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)

    Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…

  17. Company document · Union Carbide documents · October 2, 1979

    Ruth Clise to W. T. Shelton on Asbestos Monitoring in the Building 720 Basement Equipment Area (1979)

    Internal memo reporting breathing zone air samples taken on September 19, 1979 on two workers who stripped about 40 feet of suspected asbestos steamline insulation in the basement equipment area of Building 720. It reports exposures of 0.3 and 0.5…

  18. Company document · Union Carbide documents · July 17, 1981

    Industrial Hygiene Monitoring for Asbestos: Insulation Stripping Samples for Chandler, Coleman, Agosti and Templeton, Sent to R. F. Painter (1981)

    Four Union Carbide industrial hygiene monitoring forms (Computer Ref. W-1198), dated July 17, 1981, report asbestos fiber concentrations for four workers sampled on 07/10/81 while stripping and bagging steam-line insulation near Bldg…

  19. Company document · Union Carbide documents · August 1980

    Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)

    Five 'Industrial Hygiene Monitoring for Asbestos' report forms addressed to R. F. Painter with copies to several others. They give personal air-sampling results for workers wetting, bagging and stripping insulation at Bldg. 777 on 8/18/80, 8/19/80…

  20. Company document · Union Carbide documents · April 28, 1980

    Industrial Hygiene Monitoring Reports for Asbestos at the Institute #1 Powerhouse, Sent to D. L. Johnson (1980)

    Three Industrial Hygiene Monitoring for Asbestos forms, all dated 4/28/80, report fiber concentrations measured on workers T. L. Jividen, F. E. Cobb and T. G. Grant while they stripped and bagged insulation from steam lines on the #1 boiler at the…