11 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · September 25, 1986
W. J. Vincent to J. K. Corrie and Others on the New Asbestos Construction Standard (1986)
A September 1986 memo from W. J. Vincent transmitting a summary of the new OSHA Asbestos Construction Industry Standard. The attached summary covers the 0.2 f/cc permissible exposure limit, the 0.1 f/cc action level, monitoring, respirators,…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement and Removal Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie forwarding answers to questions raised at a recent meeting on asbestos abatement and removal. The attached "Asbestos Management" Q&A covers negative pressure enclosures…
-
Company document · Union Carbide documents · November 12, 1987
W. J. Vincent to W. R. White Jr. on Asbestos Air Sampling of Building 82 Floors (1987)
Two industrial hygiene summary forms dated 11/12/87 report asbestos air sampling on 10/02/87 at five floors of building 327000 Bldg 82. Each of the five 250-minute area samples is listed as in compliance, with concentrations from 0.0005 to 0.004…
-
Company document · Union Carbide documents · February 24, 1987
W. J. Vincent to All Department Heads on Labelling of Asbestos Materials, with Standard Practice SH-256 on Removal and Handling of Asbestos-Containing Insulation (1987)
A February 1987 internal memo from the South Charleston Plant Safety and Health Department told department heads that asbestos warning labels were now required on installed asbestos products whenever feasible and gave the supplier and cost. Attached…
-
Company document · Union Carbide documents · July 8, 1987
W. J. Vincent Industrial Hygiene Summary of Asbestos Air Sampling in Pipe Chases, Building 82, for W. K. White (1987)
Five-page set of industrial hygiene records for an asbestos air-sampling survey on 06/22/87 in the pipe chases of Building 82 (plant location 327000). It has a handwritten field data sheet, two summary forms dated 07/08/87 from W. J. Vincent, and…
-
Company document · Union Carbide documents · February 11, 1987
W. J. Vincent to J. K. Corrie Transmitting Responses to Asbestos Abatement Questions, South Charleston Plant (1987)
Internal Union Carbide memo from W. J. Vincent to J. K. Corrie, stamped received by the Maintenance Department on Feb. 17, 1987, forwarding answers to questions on asbestos raised at a recent meeting on asbestos abatement…
-
Company document · Union Carbide documents · March 7, 1986
W. J. Vincent to C. Priestley, Industrial Hygiene Survey Report on Asbestos Sampling at the South Charleston Plant (1986)
A one-page Industrial Hygiene Survey Report form for the South Charleston Plant, with a survey date of February 13, 1986 and asbestos as the contaminant. It lists two area samples, near the N.W. exit and near the N.E. exit, each taken over 405…
-
Company document · Union Carbide documents · October 3, 1986
W. J. Vincent to C. H. Hancock on Equipment Needs for Asbestos Monitoring (1986)
Memo from W. J. Vincent to C. H. Hancock reviewing the Industrial Hygiene Group's needs under the new asbestos standards (1910.1001 and 1926). It states that technicians counting fibers by the NIOSH 7400 method must be trained and certified, that…
-
Company document · Union Carbide documents · February 18, 1987
W. J. Vincent to J. K. Corrie Transmitting Revised Asbestos Maintenance Procedure, South Charleston Plant (1987)
A one-page internal memo from W. J. Vincent to J. K. Corrie transmitting a revised Asbestos Maintenance Procedure for the South Charleston Plant, revised to comply with the new asbestos construction standard. The attached 18-page draft, 'Provisions…
-
Company document · Union Carbide documents · May 30, 1986
W. J. Vincent to Calvin Thompson, Industrial Hygiene Survey Report on Asbestos at Logan Pump Station, South Charleston Plant (1986)
One-page industrial hygiene survey report form for the South Charleston Plant, dated May 30, 1986. It records an area/source asbestos survey at the Logan Pump Station on April 11, 1986, with a 135-minute sample and a result of .005 F/cc, marked IC…
-
Company document · Union Carbide documents · May 7, 1987
W. J. Vincent to J. K. Corrie on Glove Bag Usage During Removal of Damaged Asbestos Gasket (1987)
Internal Union Carbide memo from the South Charleston Plant Safety and Health Department, following a May 4, 1987 phone conversation about removing asbestos gaskets. It states that personal exposures had been measured at or above the…