No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

5,238 results for “Union Carbide Corporation”, page 109 of 262

  1. Company document · Union Carbide documents · March 14, 1986

    J. B. Leverton to Bill Stewart, Texas Air Control Board, Notifying of Asbestos Insulation Removal at Texas City Plant, with Attached Renovation Notice Form (1986)

    …the Texas Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos-containing insulation from conduit at Bldg. 57 of its Texas City plant between April 1 and April 11, 1986…

  2. Company document · Union Carbide documents · January 24, 1978

    Calidria Asbestos Sales Summaries and Related Metals Division Memos, Including G. L. Dickson to R. E. Byrne, Jr. on 1977 Eastern Region Sales (1978)

    A 39-page set of Union Carbide Metals Division internal memos, sales tables and notes on Calidria asbestos sales from 1975 to 1978. The lead memo (Jan. 24, 1978) from G. L. Dickson to R. E…

  3. Company document · Union Carbide documents · April 7, 1987

    P. S. Petrunich to ICF, Inc. (Attn. Tony Bansal) on GRAFOIL Flexible Graphite as a Substitute for Asbestos Packings (1987)

    Letter from Union Carbide's Specialty Products Group to ICF, Inc. describing GRAFOIL flexible graphite as a functional substitute for braided asbestos packings. It covers performance comparisons, cited industry and EPRI studies, cost and economic impact…

  4. Company document · Union Carbide documents · December 31, 1974

    H. B. Rhodes to G. L. Dickson, E. J. Kleber, T. P. Norris and J. E. Walsh on OSHA Inspections of Calidria Customers (1974)

    Internal memo from H. B. Rhodes reporting five instances in which Calidria customers described what he called overzealous application of OSHA asbestos regulations by inspectors. It asks recipients to gather facts from customers using an attached…

  5. Company document · Union Carbide documents · October 2, 1979

    Ruth Clise to W. T. Shelton on Asbestos Monitoring in the Building 720 Basement Equipment Area (1979)

    Internal memo reporting breathing zone air samples taken on September 19, 1979 on two workers who stripped about 40 feet of suspected asbestos steamline insulation in the basement equipment area of Building 720. It reports exposures of 0.3 and 0.5…

  6. Company document · Union Carbide documents · June 25, 1980

    T. P. Norris Customer Call Report on CertainTeed's 440 Asbestos Bag Opener, Riverside, California (1980)

    Customer call report by salesman T. P. Norris on a June 25, 1980 visit to CertainTeed in Riverside, California (asbestos-cement pipe industry), to observe its 440 asbestos bag opener. The handwritten results say the equipment minimizes asbestos…

  7. Company document · Union Carbide documents · March 2, 1978

    John L. Myers to E. W. Shortridge Transmitting March 1978 Calidria Sales/Shipment Estimates (1978)

    Internal Metals Division cover memo from John L. Myers to E. W. Shortridge at King City, attaching a copy of the "March Requirements". The attachment lists March 1978 sales/shipment estimates in tons by Calidria product grade, customer and location,…

  8. Company document · Union Carbide documents · December 3, 1984

    Linda Jo Grogan to T. P. Norris and J. E. Walsh Forwarding Avco's Draft Specification for Colloidal Asbestos Filler (1984)

    …Dec. 3, 1984, forwarding the attached letter Letter from Tom Lynch, Avco Specialty Materials Division, to Norma Sheild, Union Carbide, Nov. 28, 1984, enclosing specification M1003 Avco Specification M1003, Filler, Colloidal Asbestos (original issue 9-5…

  9. Company document · Union Carbide documents · September 27, 1976

    Harrison B. Rhodes to Doug Merrill (Kelly-Moore Paint Co.) on the NRDC Petition to Ban Asbestos in Patching Compounds (1976)

    Letter from Union Carbide's Technology Manager to the technical director of Kelly-Moore's Paco Textures Division. It refers to a petition by the National Resources Defense Council to ban asbestos in consumer patching compounds…

  10. Company document · Union Carbide documents · August 10, 1984

    D. B. Howard to R. H. Stodghill and D. R. Stokely on Winter Preparations for Silicones II (1984)

    Area 5 Maintenance internal correspondence asking the Silicones II staff to list equipment repairs, insulation work and facility repairs needed to prepare for winter. The memo said maintenance would then prepare a Ghant chart of expected completion…

  11. Company document · Union Carbide documents · March 8, 1971

    John L. Myers to F. G. Bertics Transmitting Calidria Asbestos Coatings Grade Data Sheet for Latex Paint (1971)

    Internal memo from John L. Myers to F. G. Bertics enclosing a technical information sheet on Calidria Asbestos Coatings Grade for latex paint. The memo says the sheet rests on preliminary information and laboratory formulations and proposes to…

  12. Company document · Union Carbide documents · June 1, 1972

    R. E. Byrne, Jr. to F. H. Larrison on New Interim Plant Control Limits for RG-244, RG-244X and SX-24 (1972)

    Internal correspondence from the Research and Development Department to the King City plant listing new interim plant control limits for RG-244, RG-244X and SX-24 (moisture, wet screen, pH, polyester viscosity, TiO2). The memo says the changes were…

  13. Company document · Union Carbide documents · October 31, 1975

    H. B. Rhodes to W. C. Thurber on Asbestos Fiber Count Summary for Calidria Asbestos (1975)

    Internal Union Carbide memo transmitting a requested summary of asbestos fiber counts for RG-244 and RG-600 materials. It explains the assumptions used, including a 0.1 fiber/cc background level, the exclusion of two…

  14. Company document · Union Carbide documents · April 8, 1986

    J. B. Leverton to Texas Air Control Board (Bill Stewart) on Asbestos Insulation Removal Notification, Texas City Plant (1986)

    Letter notifying the Texas Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from equipment in its plant at 3301 5th Avenue South, Texas City, Texas. It states that…

  15. Company document · Union Carbide documents · August 15, 1974

    E. J. Kleber's Airborne Fiber Counts for Georgia Pacific Corp., Milford, VA, with Cover Letter to Harry Scharf (1974)

    Union Carbide report of airborne asbestos fiber sampling at Georgia Pacific's Milford, VA ready-mix joint compound plant, with a summary table of seven samples and a section on objectives, operations monitored, equipment and procedure…

  16. Company document · Union Carbide documents · November 5, 1979

    G. W. Bott to W. T. Shelton on Asbestos Exposure Survey of Insulators Stripping Old Insulation, Building 773 (1979)

    Internal Union Carbide report on a November 2, 1979 survey of asbestos exposure of insulators stripping insulation from a reactor column at Building 773, South Charleston, West Virginia. It reports fiber concentrations of 0.4 and…

  17. Company document · Union Carbide documents · January 31, 1978

    Harrison B. Rhodes (signed by John L. Myers) to Dr. J. J. Welsh and T. W. Carmody on Sputum Cytology Results from the King City Asbestos Plant (1978)

    A January 1978 memo forwarding Mr. Malacarne's discussion of sputum cytology results from the King City asbestos plant, asking whether the data were sufficient for journal publication or could be used to enhance the company's image. The memo gives…

  18. Company document · Union Carbide documents · March 6, 1987

    Building Service Work Order for Encapsulating Asbestos-Containing Pipe Insulation in Linde Labs, Tarrytown Technical Center (1987)

    A handwritten Building Service Work Order from the Tarrytown Technical Center asking building services to encapsulate deteriorating pipe insulation and joint sections containing asbestos in Linde Labs 2 and 4-L. It reports test results of 10%…

  19. Company document · Union Carbide documents · July 8, 1987

    W. J. Vincent Industrial Hygiene Summary of Asbestos Air Sampling in Pipe Chases, Building 82, for W. K. White (1987)

    Five-page set of industrial hygiene records for an asbestos air-sampling survey on 06/22/87 in the pipe chases of Building 82 (plant location 327000). It has a handwritten field data sheet, two summary forms dated 07/08/87 from W. J. Vincent, and…

  20. Company document · Union Carbide documents · September 23, 1986

    T. P. Raby to C. B. Bowden and Others Transmitting ORC Asbestos Task Force Summary, Draft OSHA Inspection Instructions and Article on Court Challenges to the New Asbestos Standard (1986)

    Union Carbide internal memo, T. P. Raby to plant contacts, Asbestos Rule Update - ORC (Sept. 23, 1986) ORC memorandum (Sept. 4, 1986) by W. William Ament and Darrell K. Mattheis reviewing the Aug. 27, 1986 Task…