5,238 results for “Union Carbide Corporation”, page 123 of 262
-
Company document · Union Carbide documents · July 11, 1984
Kirk E. Martin to J. B. Leverton on Asbestos Demolition Inspection by Galveston County Health District and OSHA at Texas City (1984)
…present, of the Kimmins Corp. asbestos demolition job at Building 75 of the Texas City plant. It lists the inspector's three observations and says notices of violation would be sent to Union Carbide and Kimmins.
-
Company document · Union Carbide documents · August 23, 1987
T. G. Huff to S. W. Drake and Others: Project Scope Document for B-303 Demolition and Transite Siding Removal, South Charleston Plant (1987)
Project scope document for demolishing part of Building 303 at the South Charleston Plant and replacing asbestos-containing transite siding on the Chemical Mixing Unit Slurry Bay with insulated metal panels. It sets out mechanical, electrical and…
-
Company document · Union Carbide documents · June 22, 1987
J. E. Sanders to C. C. Neely on Where to Place the Asbestos Phaseout Program in the TMS Manuals (1987)
Memo from J. E. Sanders to C. C. Neely responding to the Task Group's April 6, 1987 transmittal of meeting minutes. Sanders agreed that the asbestos usage phaseout program should reside in the CED-sponsored TMS system, recommended summary statements…
-
Company document · Union Carbide documents · January 10, 1977
Steve Hine to L. Andrews on Fourth-Quarter 1976 Air Samples at Linde's Speedway Factory (1977)
Internal Linde Division memo in which the Speedway Factory safety director reported that 13 air samples were taken in the fourth quarter of 1976. He noted that sample #2 used a pre-weighed filter and that one operation seemed to generate more dust…
-
Company document · Union Carbide documents · June 11, 1973
B. L. Ingalls Call Report on Telephone Call to Georgia-Pacific Bestwall Gypsum, Akron, on EPA Asbestos Regulations and OSHA Citations (1973)
Call report by B. L. Ingalls of a telephone call to John Rauch, plant manager of Georgia-Pacific's Bestwall Gypsum Division in Akron, NY. Ingalls asked whether the plant knew of the April EPA asbestos regulations; Rauch did not, and said the plant…
-
Company document · Union Carbide documents · November 6, 1975
W. C. Thurber to E. R. Couture Transmitting Calidria SG-104 Sales Agreements and Kinsey Distributor Amendment, with Cover Note to Mr. Myers (1975)
A November 6, 1975 internal Metals Division letter from W. C. Thurber to the Records Center transmitting an amendment to the E. A. Kinsey Company UCON Insert Distributor Agreement and six "Calidria" asbestos SG-104 Sales Agreements dated September…
-
Company document · Union Carbide documents · April 28, 1967
Bert Murray to D. C. Willard transmitting dust survey of employees cutting and installing Kaylo insulation (1967)
A cover letter from Bert Murray to D. C. Willard, sent with a resume of dust determinations for employees cutting and installing "Kaylo" insulation, says further air sampling is needed. The attachments are a distribution list, a 1965 report by H. H.…
-
Company document · Union Carbide documents · February 22, 1983
R. R. Rankin to GOHC Distribution Transmitting Asbestos Reprints Addendum to H. C. Lewinsohn Talk (1983)
A Union Carbide internal memo from R. R. Rankin transmits an addendum to H. C. Lewinsohn's talk at the GOHC/GSC meeting in Danbury, February 7-9, 1983. The attachments are reprints of three published…
-
Company document · Union Carbide documents · June 12, 1975
Blair L. Ingalls to John L. Myers on Physical Properties of GAF Paper Bestos PB-5 (1975)
Internal memo from the Calidria asbestos Technical Service department reporting the physical properties of GAF's Paper Bestos PB-5, an asbestos product. It says PB-5 has low brightness, wet bulk between Calidria SG-130 and RG-110, and high available…
-
Company document · Union Carbide documents · November 11, 1975
J. L. Myers, R. E. Byrne, Jr. and Others on Calidria Warehouses, Inventory Levels and Warehousing Costs (1975-1982)
Compilation of internal Union Carbide Metals Division correspondence on warehousing for Calidria asbestos. It covers a November 1975 notice of a New Jersey warehouse move, 1976 memos and attached tables setting suggested inventory levels for King…
-
Company document · Union Carbide documents · January 29, 1979
J. F. Erdmann to W. H. Barlow et al. on Delegation of EPA NSPS and NESHAPS Responsibilities to the Texas Air Control Board (1979)
Internal correspondence from the Texas City plant reporting that EPA had delegated responsibility for federal NSPS and NESHAPS regulations to the Texas Air Control Board. It identified the plant's units covered (vinyl chloride monomer, and…
-
Company document · Union Carbide documents · February 15, 1978
Customer Call Report: G. L. Dickson and R. E. Byrne, Jr. at United States Steel Research Laboratory on RG-244 Asbestos Thixotrope (1978)
Call report of a 2/15/78 visit by salesman Gordon L. Dickson, with R. E. Byrne, Jr., to the United States Steel Research Laboratory in Monroeville, PA, to review the status of RG-244 (asbestos) as a thixotrope for polyester resins. It records that…
-
Company document · Union Carbide documents · May 29, 1973
H. B. Rhodes to J. L. Myers on California Emergency Asbestos Regulations (1973)
Internal Union Carbide letter-memo forwarding detailed comments on the new California emergency asbestos regulations (Section 5208), with an attached numbered list of comments and questions. The cover letter identifies the 1 fiber/cc criterion, undefined…
-
Company document · Union Carbide documents · December 11, 1981
R. E. Byrne, Jr. to G. L. Dickson, T. P. Norris and J. E. Walsh on 1982 Calidria Product Margins (1981)
Internal memo from R. E. Byrne, Jr. transmitting 1982 margin comparisons for Calidria asbestos products and asking recipients to keep them confidential. The attached table lists domestic and export grades with price per ton, normal cost per ton,…
-
Company document · Union Carbide documents · March 3, 1987
C. R. Rotthoff to Distribution List on Asbestos Management Guidance for the Specialty Chemicals Division, with Attachments (1987)
A March 3, 1987 internal memo from C. R. Rotthoff gave HS&EA guidance on managing asbestos insulation in the Specialty Chemicals Division: encapsulation of serviceable insulation, replacement of damaged insulation, and regulated removal using…
-
Company document · Union Carbide documents · January 11, 1974
John L. Myers to H. B. Rhodes on the Degussa Fumed Silica Plant in Mobile (1974)
Internal memo from John L. Myers of Calidria Asbestos Marketing to H. B. Rhodes, with copies to R. E. Byrne, G. L. Dickson, T. P. Norris, W. C. Thurber and J. E. Walsh. It asked Rhodes to monitor the fumed silica plant Degussa was building in Mobile…
-
Company document · Union Carbide documents · March 6, 1974
J. E. Walsh Call Reports on Roach Paint and Another SG-210 Carload Customer (1974)
Two Union Carbide call reports by J. E. Walsh about SG-210 (Calidria) sales to joint cement and coatings makers. The first (3/6/74) covers a carload customer, Simmons, an EPA plant inspection, and a…
-
Company document · Union Carbide documents · November 16, 1983
T. P. Norris Customer Call Report on Texas Refinery, Mexico City, Roof Coating Prospect for Calidria RG-110 (1983)
Customer call report on a quarterly call to Texas Refinery in Mexico City, a roof coating prospect. It records that a 35 lb. sample bag of RG-110 was never received, that the company still wanted to evaluate RG-110 in an aluminum asphalt roof…
-
Company document · Union Carbide documents · September 30, 1981
Koppers Company (Marietta, Georgia) Call Report Notes on RG-144 (1973-1979) and J. E. Walsh Letter to Mary Ann Alderman on RG144 Availability (1981)
Page 1 is a rotated sales call report form for Koppers Company, Marietta, Georgia (product RG-144), with dated comment entries from 1973 to 1979 on the customer's business, a Georgia regulation on asbestos use, and tonnage figures. Page 2 is a…
-
Company document · Union Carbide documents · May 27, 1987
G. W. Wulfert Minutes of the 'Future Asbestos Disposal Site(s)' Meeting, with Related Memos on the Sistersville Asbestos Landfill (1987)
Union Carbide Sistersville, WV plant memos from May 1987 about the plant's asbestos landfill, which held asbestos insulation removed from plant equipment. The May 27 minutes record an estimate that the present landfill had about…