No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

5,238 results for “Union Carbide Corporation”, page 75 of 262

  1. Company document · Union Carbide documents · October 14, 1976

    H. B. Rhodes to L. A. Vazquez Transmitting Draft Laboratory Safety Manual for Asbestos (1976)

    Internal memo from H. B. Rhodes to L. A. Vazquez, with copies to R. E. Byrne Jr., J. B. Goddard, B. L. Ingalls, J. L. Myers, C. F. Raeburn, W. C. Thurber and the file. It transmitted a draft laboratory safety manual for asbestos, prepared at the…

  2. Company document · Union Carbide documents · April 21, 1976

    Edward J. Kleber Call Report on Telephone Call to Michigan Chemical (R. C. Nametz) about RG-600 Sample (1976)

    Metals Division customer call report of a 4/21/76 telephone call by salesman Edward J. Kleber to R. C. Nametz of Michigan Chemical, Ann Arbor, MI (thermoplastics). Nametz was out of town. He said the evaluation of the RG-600 sample sent 2/18/76 was…

  3. Company document · Union Carbide documents · March 26, 1976

    T. P. Norris Call Report on Chevron Asphalt Production Trial of HPP in Asphaltic Coatings (1976)

    Metals Division customer call report dated 3/26/76 on a telecon with T. Fletcher of H&C about a production trial of HPP in asphaltic coatings for tennis courts and school grounds at Chevron Asphalt Co., Oakland. It says the first 200# of HPP was…

  4. Company document · Union Carbide documents

    Draft Script and Film Shot Notes for a Texas City Plant Presentation on Asbestos Hazards and Stripping Procedures (undated)

    Mostly handwritten script and film-shot notes for a slide or film presentation to Texas City plant personnel on asbestos health hazards and on protective equipment, barricading, wet stripping, bagging and disposal of asbestos insulation. Typed pages…

  5. Company document · Union Carbide documents · September 12, 1972

    D. E. Deese to J. Scannell (OSHA) on Interpretation of Asbestos Standards (1972), with Plant 510 Asbestos Dust Study Sheets (1973)

    …September 12, 1972 letter from Union Carbide's Gulf Coast Area senior industrial hygienist to OSHA's Office of Standards asking how to interpret the personal monitoring and medical examination sections of the June 7, 1972…

  6. Company document · Union Carbide documents · October 6, 1986

    V. E. Stover and M. A. Patel to J. M. Harbert and Others on Asbestos Exposure Monitoring at South Charleston Building 309 (1986)

    Internal Union Carbide memo transmitting results of asbestos exposure monitoring of two employees on September 9, 1986 at the South Charleston plant's Building 309, while they stripped and bagged asbestos from a 1 inch line…

  7. Company document · Union Carbide documents · July 25, 1980

    R. E. Byrne, Jr. to C. R. Stephens (3M) Acknowledging Approval of 3M Specification for RG-144 Resin Grade Asbestos, with 3M's June 1980 Transmittal and Specification

    …E. Byrne, Jr. (Union Carbide) to C. R. Stephens (3M), July 25, 1980, acknowledging approval of specification RM 11-0001-4681-8 Letter, C. R. Stephens (3M) to T. P. Norris (Union Carbide), June 6, 1980…

  8. Company document · Union Carbide documents · December 1969

    Calidria Asbestos T-135 for Viscosity Control and Pigmentation, Performance Data Brochure (1969)

    Union Carbide performance-data brochure for Calidria Asbestos T-135, a specialty asbestos co-flocculated with anatase TiO2, sold for viscosity control and as a TiO2 replacement. It gives typical physical properties, viscosity charts in water…

  9. Company document · Union Carbide documents

    Calidria Asbestos Monthly Sales Summaries and Customer Sales Reports, Including E. J. Kleber Memo on the April 1974 Report (1971-1974)

    Compilation of Union Carbide Mining and Metals Division sales reports for Calidria asbestos. It holds monthly and year-to-date sales summaries by product grade (domestic, export and total tons and $M, with percent of budget…

  10. Company document · Union Carbide documents · April 10, 1974

    John L. Myers to F. H. Larrison and G. L. Vessels on Reducing April Production Requirements (1974)

    Telex (TWX) dated April 10, 1974 from John L. Myers in Niagara Falls to the King City, California plant, with a copy to W. C. Thurber. It lowers the April production requirements for five products (SG-104, HPP-EXP, VISBESTOS, IMCOBEST, CSV), reports…

  11. Company document · Union Carbide documents · March 23, 1972

    R. W. Cope Project Report on Industrial Hygiene Survey and Asbestos Air Analyses at the Bound Brook Plant (1972)

    Project report (Project 910E10) on a February 14-15, 1972 visit to the Bound Brook Plant to sample air for asbestos fibers near Unit B, Building 3, and for nuisance dust at Unit 5, and to survey other production units for environmental health…

  12. Company document · Union Carbide documents · October 5, 1972

    S. B. Nelson to P. B. Potter on General Electric's Plan to Discontinue Asbestos-Filled Phenolic Molding Material (1972)

    Memo from the Boston sales office reporting that General Electric planned to discontinue its asbestos-filled heat-resistant phenolic molding material because of OSHA requirements, and that GE customers were reacting with concern. It recommended that…

  13. Company document · Union Carbide documents · August 7, 1974

    J. E. Walsh Call Report on Georgia Pacific, Marietta, Georgia: Dust Count at SG-210 Carload Account (1974)

    Call report by J. E. Walsh on a visit to Georgia Pacific's Marietta, Georgia joint compound plant to take dust samples at an SG-210 carload account. It describes reduced mud business, an asbestos warning sign and warning stickers at the plant, a…

  14. Company document · Union Carbide documents · December 4, 1972

    John L. Myers to P. W. McDaniel on Air Sampling for Asbestos Fibers (1972)

    Internal memo reporting on a November 16 (1972) Los Angeles symposium on asbestos and related diseases sponsored by the Southern California section of the American Industrial Hygiene Association. Myers relayed NIOSH advice on collecting asbestos air…

  15. Company document · Union Carbide documents

    Draft Procedure MSP 329, "Protection Against Breathing Asbestos," with Annual Training Aid and Quiz, Institute Plant (undated)

    A draft plant procedure (MSP 329) for removing and disposing of asbestos-containing insulation at the Institute Plant, with handwritten edits. It covers responsibilities, wet removal methods, warning signs, respirators, protective clothing, disposal…

  16. Company document · Union Carbide documents · October 16, 1986

    J. E. Sanders to L. E. Calvert, S. W. Clark, G. B. Elder and R. W. Engle Transmitting the Recommended C&P Program to Phase Out Asbestos-Containing Materials in the Workplace, with C. C. Neely's Cover Memo and Draft Policy (1986)

    Sanders' October 16, 1986 internal cover letter forwards to his team the recommendation on asbestos usage that he sent to Bob Perry. Attached are C. C. Neely's September 30, 1986 memo on the final draft of the Chemicals and Plastics Group program,…

  17. Company document · Union Carbide documents · October 7, 1968

    R. S. Wishart, Jr. to F. D. Dexter on Possible Sale of the Calidria Asbestos Project to Johns Manville (1968)

    Internal Union Carbide memo reporting that Kenneth Rush had spoken with Mr. Burnett of Johns Manville about the Calidria asbestos project and that Burnett would respond in about three weeks. It relays Rush's advice on…

  18. Company document · Union Carbide documents · March 21, 1977

    G. W. Bott to W. T. Shelton on Water Sprayers for Removing Asbestos Pipe Covering at the Tech Center (1977)

    Internal Union Carbide correspondence from G. W. Bott to W. T. Shelton recommending the purchase of two one-gallon garden-type sprayers, similar to the Hudson Model 6215, for the Tech Center. The sprayers were to…

  19. Company document · Union Carbide documents · March 24, 1983

    G. L. Dickson and R. E. Byrne, Jr. Customer Call Reports on Grace GmbH (Worms) Calidria Seminar and German Asbestos Regulations (1983)

    Customer call reports for a March 24, 1983 visit to Grace GmbH, the Calidria distributor in Worms, Germany. The first report (pages 1-2) summarizes an afternoon seminar with Grace marketing staff on packaging, lead time, samples, asbestos…

  20. Company document · Union Carbide documents · June 7, 1967

    C. U. Darnehl to T. J. Hall on the Sayers Asbestos Report and Injection Studies of Coalinga Fiber (1967)

    Letter from Union Carbide's Associate Medical Director to a colleague at Union Carbide Europa in Geneva. It comments on I. C. Sayers' report 'Asbestos As A Health Hazard In The United Kingdom' and describes preliminary…