8 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · August 29, 1972
D. R. Albright to Bound Brook Distribution on Disposable Coveralls for Asbestos Work (1972)
A letter-memo dated August 29, 1972 from the Bound Brook, New Jersey Chemicals and Plastics site setting out a policy for issuing, collecting and disposing of disposable coveralls for asbestos work. It specifies which employees receive them, how…
-
Company document · Union Carbide documents · January 3, 1974
R. T. Marold to W. F. Ark and Others Transmitting Bulk Handling Asbestos Program Review, Carey Floats vs. Calidria Pelleted Asbestos, Bound Brook (1974)
…in bulk for the phenolic molding compound department at Bound Brook: Union Carbide's pelleted SG-200 asbestos (Calidria) or Carey floats asbestos. The memo asks whether Union Carbide will keep supplying asbestos-filled molding materials…
-
Company document · Union Carbide documents · May 29, 1973
F. A. Schillinger Memo to C. F. Martino, P. B. Potter and G. R. Stringer on the May 18, 1973 Molding Material Meeting (1973)
Memo summarizing a May 18, 1973 molding material meeting at Bound Brook. It covers production in Canada, product problems, and a planned trial substituting Calidria SG-210 asbestos/CaCO3 blends for Carey asbestos. It also notes that new bags with an…
-
Company document · Union Carbide documents · November 22, 1972
Memo to R. E. Nicolson on Asbestos Filler Used in Phenolic Molding Compounds (1972)
…reporting a November 17, 1972 meeting on strategy for asbestos filler in Union Carbide's phenolic molding compounds. It describes the existing plan to bulk handle Carey asbestos and General Electric's announced move away from…
-
Company document · Union Carbide documents · February 22, 1973
L. O. Pietila to P. R. Wildgen on Asbestos-Free Insulation at Bound Brook (1973)
Internal correspondence proposing steps to provide asbestos-free insulating materials at the Bound Brook facility. It covers checking MRO store items for asbestos-free replacements, revising construction specifications, demolition precautions for…
-
Company document · Union Carbide documents · September 26, 1973
R. T. Marold, C. F. Martino and P. B. Potter on the Asbestos Replacement Program and Calidria Grinding Tests (1973)
Memo reporting a special meeting of the Asbestos Replacement Committee on September 19, 1973, held after production grinding tests on BMM-6935 did not give an acceptable dispersion of Calidria asbestos. It records an estimated 6 to 9 month delay,…
-
Company document · Union Carbide documents · November 8, 1972
W. D. Neal to D. R. Albright on Asbestos Dust Measurements at the Bound Brook Plant (1972)
Internal memo from W. D. Neal of Environmental Protection reporting September and October 1972 airborne asbestos sampling in the Unit B and C work areas at Bound Brook, compared with OSHA limits. It lists housekeeping, bag-handling and work-habit…
-
Company document · Union Carbide documents · January 4, 1973
J. M. Swalm to R. A. DeCoudres on Bound Brook In-Plant Environmental Activities for December 1972, Including Airborne Asbestos (1973)
Internal Union Carbide memo summarizing environmental items at the Bound Brook plant for December 1972, copied to about a dozen others. Topics include an OSHA citation, sewer monitoring, waste disposal, dust, noise, odors, carbon monoxide and…