Company document · Union Carbide documents · July 9, 1971
R. W. Schwartz Memo Forwarding Minutes of the GE/Hooker/Union Carbide Safety Meeting on Asbestos Handling (1971)
…July 9, 1971 cover memo sent a distribution list the minutes of a June 18, 1971 safety meeting among General Electric, Hooker Chemical and Union Carbide, and pointed readers to the asbestos paragraphs. The minutes, prepared…
-
Company document · Union Carbide documents · November 16, 1979
Technical Center IH/EP (Ruth Clise) to D. L. Johnson on Asbestos Monitoring During Insulation Stripping in the 704 Powerhouse (1979)
Internal industrial hygiene report on air sampling done October 26, 1979 while Construction workers stripped and bagged asbestos-containing insulation from an exhaust duct in the Building 704 Powerhouse in South Charleston. It reports that dust on…
-
Company document · Union Carbide documents · December 5, 1978
G. F. Hurley and M. E. Perry to Distribution on Clarification of Monitoring for Removal and Disposal of Asbestos-Containing Insulation (1978)
A December 5, 1978 memorandum from G. F. Hurley and M. E. Perry to a distribution list clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It states that the Industrial Hygiene…
-
Company document · Union Carbide documents · March 23, 1972
R. W. Cope Project Report on Industrial Hygiene Survey and Asbestos Air Analyses at the Bound Brook Plant (1972)
Project report (Project 910E10) on a February 14-15, 1972 visit to the Bound Brook Plant to sample air for asbestos fibers near Unit B, Building 3, and for nuisance dust at Unit 5, and to survey other production units for environmental health…
-
Company document · Union Carbide documents · October 2, 1979
Ruth Clise to W. T. Shelton on Asbestos Monitoring of Insulation Stripping in Building 720, South Charleston (1979)
Internal memo reporting breathing zone air sampling taken September 19, 1979 on two workers, J. R. Monin and J. W. Greenlee, while they stripped about 40 feet of suspected asbestos steamline insulation in the basement of Building 720. It reported…
-
Company document · Union Carbide documents · August 14, 1978
E. R. Levy Memo on Orientation for Personnel Safety and Health Training Package Preparers, with L. S. Slaughter Memo and Engineering Department Training Team Report (1978)
The exhibit holds two Union Carbide Engineering memoranda from August 1978 and attachments from a report of the Engineering Department's personnel safety and health training task team. E. R. Levy's memo of August 14…
-
Company document · Union Carbide documents · July 6, 1979
G. W. Bott to P. W. Young on Asbestos Exposure Survey of Insulators Stripping Old Insulation at Institute Plant (1979)
Internal Union Carbide memo reporting an industrial hygiene survey on July 2, 1979 of construction insulators stripping asbestos insulation from the #3 turbine and about thirty feet of four-inch pipe in Building 17 at the…
-
Company document · Union Carbide documents · December 1, 1970
H. L. Robinson to Plant Managers on the Plant Safety Audit Program (1970)
Internal memo from the Group I/Hydrocarbons Safety department transmitting a Plant Safety Audit Guide for a safety audit program then being instituted. It says audits would be completed by year end at Taft, Torrance, Marietta and South Charleston,…
-
Company document · Union Carbide documents · April 11, 1975
H. L. Robinson to W. Thurber Transmitting Digests of Indiana Asbestos Bills S-296 and S-358 (1975)
An internal Union Carbide letter from H. L. Robinson to W. Thurber reporting that Indiana Senate Bill S-296 never came out of committee and attaching digests of two Indiana asbestos bills. The attachments are Senate…
-
Company document · Union Carbide documents · February 24, 1972
R. W. Cope Project Report on Industrial Hygiene Survey of Air Analyses at the Bound Brook Plant (1972)
Project report on R. W. Cope's January 27-28, 1972 visit to the Bound Brook Plant to meet New Jersey inspectors and compare dust sampling methods, with air samples taken in several departments. Asbestos fiber samples at Building 3, Unit C ranged…
-
Company document · Union Carbide documents · December 5, 1978
G. F. Hurley and M. E. Perry to Distribution on Clarification of Asbestos Insulation Removal and Monitoring Rules, South Charleston (1978)
Memorandum clarifying items 1 and 2 of a November 6, 1978 Merz/Perry letter on removal and disposal of asbestos-containing insulation. It stated when the Industrial Hygiene Group would decide on personal asbestos monitoring during demolition,…