1,791 results for “Union Carbide Corporation”, page 32 of 90
-
Company document · Union Carbide documents · February 24, 1983
G. L. Dickson to W. C. Thurber on the 1983 Revised Sales Estimate for Calidria Asbestos (1983)
Internal memo from G. L. Dickson to W. C. Thurber transmitting a revised 1983 sales estimate for Calidria asbestos, which showed a $154M increase in NIFS over the original 1983 budget. The memo tabulates 1982 and 1983 carload and truckload prices by…
-
Company document · Union Carbide documents · October 7, 1986
A. F. Terry to T. L. Collins and Others on Asbestos Exposure Monitoring of Steam Line Stripping, Building 726 (1986)
Internal Union Carbide memo transmitting asbestos air-monitoring results for two employees, R. P. Hess and F. R. Creech, who stripped asbestos insulation from steam lines outside and inside the Building 726 compressor room on September…
-
Company document · Union Carbide documents · September 30, 1985
J. B. Leverton to Texas Air Control Board on Asbestos Ceiling Tile Removal at the Texas City Plant (1985)
…40 CFR 61.146, that Union Carbide planned to remove about 700 square feet of 18-year-old ceiling tile from Building 89 at its Texas City plant between late October 1985 and October 31, 1985…
-
Company document · Union Carbide documents · June 22, 1987
J. E. Sanders to C. C. Neely on the Permanent Home for the Asbestos Phaseout Program (1987)
Memo from J. E. Sanders to C. C. Neely responding to the Task Group's April 6, 1987 transmittal of meeting minutes. Sanders agreed that the asbestos phaseout program should reside in the CED-sponsored TMS system, recommended summary statements in…
-
Company document · Union Carbide documents · March 16, 1982
Compilation: W. D. Neal to T. P. Raby on Asbestos Removal, with K. E. Martin Transmittal and OSHA Letter on Supplied-Air Respirators for Asbestos Demolition (1982)
Compilation of a March 16, 1982 Union Carbide internal memo from W. D. Neal to T. P. Raby on asbestos removal, a March 11, 1982 transmittal memo from Kirk E. Martin at Texas City, and a…
-
Company document · Union Carbide documents · January 4, 1982
Calidria Asbestos Price List for RG-144 and RG-100 Grades (1982)
One-page Calidria asbestos price list effective January 4, 1982, for grades RG-144 and RG-100, which are described as fibers used as thixotropes and viscosity control agents in resin compounds. It gives net prices in cents per pound by shipping…
-
Company document · Union Carbide documents · January 18, 1983
Reaction Department Share Audit and Noise, Hearing Protection and Detector Tube Inspection Forms Completed by Mario Gutierrez (1983)
Set of January 1983 audit and inspection forms for the Reaction department. It includes a Share Audit Procedure sheet on hearing conservation and detector tubes, noise and hearing protection inspections for Reaction #1 and #2, and detector tube…
-
Company document · Union Carbide documents · July 1, 1987
Organization Chart of Solvents & Coatings Materials Division Research and Development, South Charleston Technical Center (1987)
One-page organization chart, marked 'UCC Business Confidential', for Research and Development in the Solvents & Coatings Materials Division at the South Charleston Technical Center. E. S. Brown, Director of Technology, heads the chart. Reporting…
-
Company document · Union Carbide documents · March 14, 1986
J. B. Leverton to Bill Stewart, Texas Air Control Board, Notifying of Asbestos Insulation Removal at Texas City Plant, with Attached Renovation Notice Form (1986)
…the Texas Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos-containing insulation from conduit at Bldg. 57 of its Texas City plant between April 1 and April 11, 1986…
-
Company document · Union Carbide documents · April 7, 1987
P. S. Petrunich to ICF, Inc. (Attn. Tony Bansal) on GRAFOIL Flexible Graphite as a Substitute for Asbestos Packings (1987)
Letter from Union Carbide's Specialty Products Group to ICF, Inc. describing GRAFOIL flexible graphite as a functional substitute for braided asbestos packings. It covers performance comparisons, cited industry and EPRI studies, cost and economic impact…
-
Company document · Union Carbide documents · June 25, 1980
T. P. Norris Customer Call Report on CertainTeed's 440 Asbestos Bag Opener, Riverside, California (1980)
Customer call report by salesman T. P. Norris on a June 25, 1980 visit to CertainTeed in Riverside, California (asbestos-cement pipe industry), to observe its 440 asbestos bag opener. The handwritten results say the equipment minimizes asbestos…
-
Company document · Union Carbide documents · December 3, 1984
Linda Jo Grogan to T. P. Norris and J. E. Walsh Forwarding Avco's Draft Specification for Colloidal Asbestos Filler (1984)
…Dec. 3, 1984, forwarding the attached letter Letter from Tom Lynch, Avco Specialty Materials Division, to Norma Sheild, Union Carbide, Nov. 28, 1984, enclosing specification M1003 Avco Specification M1003, Filler, Colloidal Asbestos (original issue 9-5…
-
Company document · Union Carbide documents · August 10, 1984
D. B. Howard to R. H. Stodghill and D. R. Stokely on Winter Preparations for Silicones II (1984)
Area 5 Maintenance internal correspondence asking the Silicones II staff to list equipment repairs, insulation work and facility repairs needed to prepare for winter. The memo said maintenance would then prepare a Ghant chart of expected completion…
-
Company document · Union Carbide documents · April 8, 1986
J. B. Leverton to Texas Air Control Board (Bill Stewart) on Asbestos Insulation Removal Notification, Texas City Plant (1986)
Letter notifying the Texas Air Control Board, under 40 CFR 61.146, that Union Carbide planned to remove asbestos insulation from equipment in its plant at 3301 5th Avenue South, Texas City, Texas. It states that…
-
Company document · Union Carbide documents · March 6, 1987
Building Service Work Order for Encapsulating Asbestos-Containing Pipe Insulation in Linde Labs, Tarrytown Technical Center (1987)
A handwritten Building Service Work Order from the Tarrytown Technical Center asking building services to encapsulate deteriorating pipe insulation and joint sections containing asbestos in Linde Labs 2 and 4-L. It reports test results of 10%…
-
Company document · Union Carbide documents · July 8, 1987
W. J. Vincent Industrial Hygiene Summary of Asbestos Air Sampling in Pipe Chases, Building 82, for W. K. White (1987)
Five-page set of industrial hygiene records for an asbestos air-sampling survey on 06/22/87 in the pipe chases of Building 82 (plant location 327000). It has a handwritten field data sheet, two summary forms dated 07/08/87 from W. J. Vincent, and…
-
Company document · Union Carbide documents · September 23, 1986
T. P. Raby to C. B. Bowden and Others Transmitting ORC Asbestos Task Force Summary, Draft OSHA Inspection Instructions and Article on Court Challenges to the New Asbestos Standard (1986)
Union Carbide internal memo, T. P. Raby to plant contacts, Asbestos Rule Update - ORC (Sept. 23, 1986) ORC memorandum (Sept. 4, 1986) by W. William Ament and Darrell K. Mattheis reviewing the Aug. 27, 1986 Task…
-
Company document · Union Carbide documents · May 23, 1984
T. P. Norris Correction Note and Customer Call Report on Mortell Co., Kankakee, Illinois (1984)
A handwritten correction note dated May 23, 1984 is attached to a Customer Call Report for Mortell Co., Kankakee, IL, dated 04-26-84. The note says the report came from a telephone conversation, not a personal call, because Bruce Davis was…
-
Company document · Union Carbide documents · February 1987
Maintenance Safety Manual XVIII, Asbestos Handling Procedure, South Charleston Plant (1987)
Section XVIII of the South Charleston Plant Maintenance Safety Manual, dated 2/87, setting out the mandatory procedure for handling and removing asbestos insulation at the plant. It covers definitions, responsibilities, respirators, protective…
-
Company document · Union Carbide documents · December 31, 1985
J. G. Roy Memoranda and Work Plan on Asbestos Removal at the No. 2 Steam Plant, South Charleston (1985)
Two memoranda from J. G. Roy, the first dated December 31, 1985, transmitting a plan to remove asbestos from idle facilities in the No. 2 Steam Plant and the second sending the work plan and a contractor sign-in form to the ES supervisors. The…