10 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · July 25, 1980
H. H. Frazier to G. F. Hurley on Asbestos Exposure Potential at the No. 1 Steam Plant Precipitators, Institute Plant (1980)
Internal memo reporting air sampling for asbestos on July 21, 1980 around asbestos-containing insulation on the No. 1 Steam Plant precipitators during the boiler retubing project at the Institute plant. It lists personal and area sample results,…
-
Company document · Union Carbide documents · July 25, 1980
H. H. Frazier to G. F. Hurley on Asbestos Exposure Potential at the Precipitators, No. 1 Steam Plant, Institute Plant (1980)
Internal correspondence from Industrial Hygiene reporting airborne asbestos sampling on July 21, 1980 at the No. 1 Steam Plant precipitators, where protective cover over asbestos-containing insulation had been torn off by a storm. It lists personal…
-
Company document · Union Carbide documents · October 20, 1981
M. A. Patel to W. L. Browning and J. W. Perry, Jr. on Asbestos Monitoring in the Gasket Shop, Institute Plant (1981)
Internal memo reporting area and personal asbestos exposure monitoring in the Gasket Shop (laundry, Building 3 of the Construction Department) at the Institute Plant, done by the plant's industrial hygiene group on October 2 and 9, 1981. It states…
-
Company document · Union Carbide documents · October 23, 1981
M. A. Patel to W. L. Browning, J. W. Perry Jr. and Others on Asbestos Monitoring in the Gasket Shop, 512 Construction, Institute Plant, with Replacement Letter and Data Sheet (1981)
Internal Union Carbide correspondence from Manhar A. Patel. A cover note says an October 20, 1981 letter on asbestos monitoring in the Institute Plant gasket shop contained an error and should be replaced. The replacement letter…
-
Company document · Union Carbide documents · October 14, 1981
H. H. Frazier to R. E. Peele on Monitoring for Asbestos Exposure Potential in the 511 Construction Gasket Shop (1981)
Internal Union Carbide memo from H. H. Frazier of Industrial Hygiene to R. E. Peele stating that two personal and two area air samples were collected in the 511 Construction Gasket Shop to measure airborne asbestos…
-
Company document · Union Carbide documents · October 14, 1981
H. H. Frazier to R. E. Peele on Monitoring for Asbestos Exposure Potential in the 511 Construction Gasket Shop (1981)
One-page internal Union Carbide memo from Industrial Hygiene at the Institute Plant, West Virginia. It reports that two personal and two area air samples were collected in the 511 Construction Gasket Shop to measure airborne…
-
Company document · Union Carbide documents · July 25, 1980
H. H. Frazier to G. F. Hurley on Asbestos Exposure Potential at the No. 1 Steam Plant Precipitators, Institute Plant (1980)
Internal correspondence from Industrial Hygiene reporting airborne asbestos sampling on July 21, 1980 at the No. 1 Steam Plant precipitators, where asbestos-containing insulation was exposed after a storm tore off protective covering. The memo lists…
-
Company document · Union Carbide documents · March 15, 1983
H. H. Frazier to R. G. Hull, Jr. on Personal Asbestos Exposure During Acetone Unit Demolition, Complex VI (1983)
Internal Union Carbide memo from Industrial Hygiene at the Institute Plant reporting three airborne asbestos samples taken during insulation demolition at the Acetone Unit. It gives results of 0.2, 0.5 and 0.8 fibers…
-
Company document · Union Carbide documents · March 15, 1983
H. H. Frazier to P. J. Morris on Personal Asbestos Exposure Monitoring of Two Insulator/Painters at Maintenance Complex VIII, Institute Plant (1983)
Internal Union Carbide memo reporting personal air monitoring of two insulator/painters removing protective covering from asbestos-insulated pipe valve at Maintenance Complex VIII on 2/3/83. It reports 15-minute results of 0.8…