14 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting asbestos air monitoring in the SEVIN operations area on September 3, 1980, which showed 0.1 fiber per cc. Six breathing-zone samples were taken on three men, but an analytical error left only one valid sample, for Mr. Smith. The…
-
Company document · Union Carbide documents · September 12, 1980
G. F. Hurley to B. E. Bess, P. W. Young and Others on Asbestos Exposure Monitoring in the SEVIN Operations Area (1980)
Letter reporting that asbestos monitoring in the SEVIN operations area on September 3, 1980 showed 0.1 fiber per cc, which it described as below the present OSHA standard. Six breathing-zone samples were taken on three men, but because of an…
-
Company document · Union Carbide documents · March 19, 1982
Industrial Hygiene Monitoring for Asbestos, Building 701-100 Insulation Cleanup, Reported to J. E. Midkiff (1982)
Four pages of Union Carbide industrial hygiene monitoring reports (computer refs. W-1401, W-1402, W-1405) dated March 19, 1982, giving airborne asbestos fiber results for workers Warren Abbot, Paul Crowder and Dave Shamblin during…
-
Company document · Union Carbide documents · July 17, 1981
Industrial Hygiene Monitoring for Asbestos: R. F. Painter Report on Insulation Stripping and Bagging, Bldg. 774 (1981)
Four 'Industrial Hygiene Monitoring for Asbestos' forms (Computer Ref. W-1198), dated July 17, 1981 and stamped Business Confidential. They report AM and PM personal air samples for four workers on 07/10/81 during stripping and bagging of insulation…
-
Company document · Union Carbide documents · July 16, 1982
Manhar A. Patel to J. C. Smith on Dust and MEK Monitoring in the Sandblast Shed, 511 Construction Institute Plant (1982)
Internal Union Carbide letter reporting dust sampling for 'Black Beauty' in the Sandblast Shed and methyl ethyl ketone (MEK) sampling in the Paint Preparation Shed at the 511 Construction Institute Plant, May-June 1982. It says…
-
Company document · Union Carbide documents · April 19, 1982
Randy Noble to T. L. Crouch, E. C. Shipley and E. J. Tawney on Supervisor's Reports for Asbestos Insulation Removal and Disposal (1982)
A one-page memorandum from the Safety Administrator at Central Engineering, South Charleston, West Virginia, stating that the Insulator Supervisor must complete the attached report for every asbestos removal job under the company's removal and…
-
Company document · Union Carbide documents · April 26, 1982
Mark E. Bell to R. F. Painter: Industrial Hygiene Monitoring for Asbestos, D. C. Shamblin, Building 706 (1982)
Union Carbide 'Industrial Hygiene Monitoring for Asbestos' form, Computer Ref. W-1315, reporting air sampling of D. C. Shamblin in Building 706 on 4/21/82. It lists a personal sample of 1.2 fibers >5…
-
Company document · Union Carbide documents · August 1980
Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)
Five 'Industrial Hygiene Monitoring for Asbestos' report forms addressed to R. F. Painter with copies to several others. They give personal air-sampling results for workers wetting, bagging and stripping insulation at Bldg. 777 on 8/18/80, 8/19/80…
-
Company document · Union Carbide documents · March 3, 1980
Technical Center IH/EP to D. L. Johnson and Others on Asbestos Monitoring at Institute #2 Powerhouse (1980)
Internal Union Carbide memo reporting a February 20, 1980 survey of employee exposure to airborne asbestos fibers during removal of boiler insulation at the #2 Powerhouse at Institute, West Virginia. Personal air samples measured 0.2…
-
Company document · Union Carbide documents · March 3, 1980
Technical Center Industrial Hygiene Report on Asbestos Monitoring During Boiler Insulation Removal at Institute #2 Powerhouse (1980)
Internal correspondence reporting personal air sampling of employees during removal of insulation from a boiler at the #2 Powerhouse at Institute, West Virginia, on February 20, 1980. Sample concentrations ranged from 0.2 to 0.8 f/cc, which the memo…
-
Company document · Union Carbide documents · March 20, 1981
R. J. Sexton to E. C. Shipley Requesting Names of Construction Department Employees Exposed to Asbestos or Silica, Institute Plant (1981)
Internal correspondence from the Institute Plant medical director to E. C. Shipley, subject "Medical Surveillance for Asbestosis - 1981 Survey." It asked for the names and payroll numbers of Construction Department employees who had or were having…
-
Company document · Union Carbide documents · April 26, 1982
Mark E. Bell to R. F. Painter on Industrial Hygiene Asbestos Monitoring of Insulation Stripping in Building 706, D. C. Shamblin and R. E. Templeton (1982)
Two Union Carbide industrial hygiene monitoring forms dated April 26, 1982, reporting asbestos air samples taken April 21, 1982 in Building 706 while insulators stripped insulation from a steam line and condensate line. Page 1 reports…
-
Company document · Union Carbide documents · April 9, 1980
W. F. Blythe, Jr. to D. L. Johnson on Asbestos Monitoring at Institute #1 Powerhouse (1980)
Internal Union Carbide memo reporting an April 1980 air-monitoring survey of employees removing insulation from the #2 boiler in the Institute #1 Powerhouse. It states that personal samples ranged from 0.17 to 0.41…
-
Company document · Union Carbide documents · March 20, 1981
R. J. Sexton to E. C. Shipley Requesting Names of Construction Employees Exposed to Asbestos or Silica for 1981 Medical Surveillance (1981)
Internal correspondence from the Institute Plant medical director asking Mr. Shipley for the names and payroll numbers of Construction Department employees who have had or are having exposures to asbestos or silica. He asked for a new list rather…